Skip to content
PlanIndex Get alerts
Menu

Planning application

Longacre Kirkham Road Horndon On The Hill Essex SS17 8QE

Awaiting decision Thurrock 26/00771/FUL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Extend an existing outbuilding and convert into an annexe to be used by a family member with a disability

As published by the council, reference 26/00771/FUL

Application record

Reference
26/00771/FUL
Category
Full applications
Status
Awaiting decision
Received
3 Jul 2026
Validated
18 Sep 2026
Ward
Orsett Horndon And Bulphan
Postcode
SS17 8QE

Timeline

Dates from the published record

  1. 3 Jul 2026

    Received by Thurrock

  2. 18 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 18 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 13 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Thurrock took a median of 57 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Surv Design Limited Agent, a design practice registered in London

Active · incorporated 2026 · London

6 applications on PlanIndex · across 3 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

  • LOCATION PLAN Current Plan · 07 Aug 2026
  • FUL APPLICATION FORM Application Form · 07 Aug 2026
  • APPLICATIONFORMREDACTED Application Form · 03 Jul 2026
  • EXISTING PLANS AND ELEVATIONS Current Plan · 03 Jul 2026
  • PROPOSED OUTBUILDING PLANS Current Plan · 03 Jul 2026
  • PROPOSED OUTBUILDING ELEVATIONS Current Plan · 03 Jul 2026
  • LOCATION AND PROPOSED BLOCK PLAN Superseded Plan · 03 Jul 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Thurrock for determination, against a statutory target of eight weeks. Over the last year Thurrock decided full applications in a median of 85 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Woodside Kirkham Road Horndon On The Hill Essex SS17 8QE

    26/00957/CONDC Submitted 19 Aug 2026 50 yards away

    85% historically approved · decision due ~14 Oct

    Application for the approval of details reserved by condition Condition 7 - (Dust Management Plan) of planning permission ref. 25/00916/FUL (Proposed demolition of the existing single storey detached barn building and construction of a detached one bedroom chalet style dwelling including car parking, cycle storage, refuse area and rear garden area with separation from existing main dwelling).

    Awaiting decision Demolition 2 docs
    Small domestic
  • Riverview Kirkham Shaw Horndon On The Hill Essex SS17 8QE

    23/00037/PHA Submitted 23 Dec 2022 50 yards away

    Rear extension with a depth of 8 metres from the original rear wall of the property, with a maximum height of 4 metres and eaves height of 3 metres.

    Refused Prior approval Extension 8 docs
  • Kingleigh Kirkham Road Horndon On The Hill Essex SS17 8QE

    21/00786/PHA Submitted 10 May 2021 100 yards away

    Rear extension with a depth of 8 metres from the original rear wall of the property, with a maximum height of 4 metres and eaves height of 2.50 metres.

    Granted Prior approval Extension 5 docs
  • Hartswood Kirkham Shaw Horndon On The Hill Essex SS17 8QE

    26/00219/FUL Submitted 26 Feb 2026 150 yards away

    2 Bedroom bungalow with 2 parking spaces

    Refused Full applications 18 docs
  • Dahlia Cottage Kirkham Shaw Horndon On The Hill Essex SS17 8QE

    21/00660/FUL Submitted 21 Apr 2021 150 yards away

    Erection of dog kennel buildings and change of use of part of the land from open space to use as a dog kennels breeding business

    Refused Full applications 11 docs
  • The Laurels Lower Dunton Road Horndon On The Hill Essex SS17 8QD

    19/01637/CLOPUD Submitted 31 Oct 2019 150 yards away

    Single storey side extension

    Granted Lawful development Extension 16 docs
    Small domestic

In Thurrock

  • 26/01062/FUL Awaiting decision

    Partyman World Unit 9 The Boardwalk Lakeside Shopping Centre West Thurrock Way West Thurrock Essex RM20 2ZN

    External Building Alterations Comprising Replacement Windows

    Received 11 Sep, published by the council 17 Sep 2026 Full applications
  • 26/01048/FUL Awaiting decision

    Kings House The Green West Tilbury Essex RM18 8TU

    New dwelling and associated works including parking and landscaping.

    Received 7 Sep, published by the council 18 Sep 2026 Full applications
  • 26/00765/FUL Granted

    133 Dock Road Tilbury Essex RM18 7BT

    Change of use from a 6 occupant HMO (use class C4) to a House of Multiple Occupancy for 7 occupants (Sui Generis).

    Received 2 Jul, published by the council 23 Jul 2026 Full applications
  • 26/00657/FUL Granted

    Bannatyne's Health Club And Spa Howard Road Chafford Hundred Grays Essex RM16 6YJ

    Installation of two additional rapid electric vehicle (EV) charging stations, together with associated CCTV infrastructure, reconfiguration of existing kerbing, and the creation of five car parking spaces

    Received 12 Jun, published by the council 23 Jul 2026 Full applications
  • 26/00799/FUL Refused

    2 First Avenue West Thurrock Essex RM20 3JR

    Demolition of the existing outbuilding(s) and erection of a detached three-bedroom dwelling to the rear of 2 First Avenue, with associated access, landscaping and ancillary works.

    Received 9 Jul, published by the council 23 Jul 2026 Full applications