Skip to content
PlanIndex Get alerts
Menu

Planning application

BP Orsett Cock Petrol Station Eastbound Orsett Cock Roundabout To Stanford Interchange Eastbound Orsett Essex RM16 3AY

Awaiting decision Thurrock 26/00461/FUL Full Planning Permission Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of 6no EV parking bays, 3no EV chargers and associated electrical infrastructure (including substation, LV feeder pillar enclosed within timber fence, LMS cabinet and metering cabinet) within existing BP fuel station.

As published by the council, reference 26/00461/FUL

Application record

Reference
26/00461/FUL
Type
Full Planning Permission Application
Status
Awaiting decision
Received
29 Apr 2026
Validated
30 Apr 2026
Ward
OLD Orsett
Postcode
RM16 3AY

Timeline

Dates from the published record

  1. 29 Apr 2026

    Received by Thurrock

  2. 30 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 25 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Thurrock took a median of 57 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Smith Design Associates Agent, a design practice

Active · incorporated 1994

47 applications on PlanIndex · across 9 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

35 documents on file for this application

  • SWEPT PATH ANALYSIS Current Plan · 08 Sep 2026
  • SWEPT PATH ANALYSIS Current Plan · 08 Sep 2026
  • TC HIGHWAYS Consultee Comment · 14 Aug 2026
  • ROAD SAFETY AUDIT Studies and Reports · 12 Aug 2026
  • DESIGNER?S RESPONSE SPREADSHEET Studies and Reports · 12 Aug 2026
  • PROPOSED SITE PLAN Current Plan · 12 Aug 2026
  • ECOLOGY Consultee Comment · 29 Jul 2026
  • TC HIGHWAYS Consultee Comment · 13 Jul 2026
  • ESSEX COUNTY COUNCIL ARCHAEOLOGICAL SECTION. Consultee Comment · 09 Jun 2026
  • ENV HEALTH Consultee Comment · 28 May 2026
  • TC HIGHWAYS Consultee Comment · 20 May 2026
  • APPLICATIONFORMREDACTED Application Form · 29 Apr 2026
  • G3225 P01 REV 1 - LOCATION PLAN Current Plan · 29 Apr 2026
  • G3225 P02 REV 1 - EXISTING SITE PLAN Current Plan · 29 Apr 2026
  • G3225 P03 REV 2 - PROPOSED SITE PLAN Superseded · 29 Apr 2026
  • G3225 P04 REV 2 - PROPOSED EXTERNAL FINISHES Current Plan · 29 Apr 2026
  • G3225 P05 REV 2 - PROPOSED LINING Current Plan · 29 Apr 2026
  • G3225 P06 REV 2 - PROPOSED PROTECTION AND BOLLARDS Current Plan · 29 Apr 2026
  • G3225 P08 REV 2 - PROPOSED SIGNAGE Current Plan · 29 Apr 2026
  • G3225 P10 REV 2 - PROPOSED SITE ELEVATIONS Current Plan · 29 Apr 2026
  • G3225 P14 REV 2 - PROPOSED TIMBER ENCLOSURE Current Plan · 29 Apr 2026
  • G3225 P15 REV 2 - PROPOSED SUBSTATION Current Plan · 29 Apr 2026
  • G3225 P16 REV 2 - PROPOSED METERING CABINET Current Plan · 29 Apr 2026
  • G3225 P17 REV 2 - PROPOSED EV CHARGER Current Plan · 29 Apr 2026
  • G3225 P19 REV 2 - PROPOSED LMS CABINET Current Plan · 29 Apr 2026
  • BP ORSETT NORTH - TRANSPORT STATEMENT Studies and Reports · 29 Apr 2026
  • BNG METRIC - DECEMBER 2025 Studies and Reports · 29 Apr 2026
  • BNG REPORT - DECEMBER 2025 Studies and Reports · 29 Apr 2026
  • 2500A LV PILLAR GA Studies and Reports · 29 Apr 2026
  • HYC400_PRODUCT_DATA_SHEET_V1-1 Studies and Reports · 29 Apr 2026
  • LMS CABINET Studies and Reports · 29 Apr 2026
  • PLAN VIEW ELEVATION Current Plan · 29 Apr 2026
  • TYPE E BOLLARD Current Plan · 29 Apr 2026
  • PLAN VIEW ELEVATION- ROADSIDE RANGE TYPE O Current Plan · 29 Apr 2026
  • PLANNING STATEMENT BP ORSETT NORTH Studies and Reports · 29 Apr 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Thurrock for determination, against a statutory target of eight weeks. Over the last year Thurrock decided full applications in a median of 85 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Thurrock

  • 26/01062/FUL Awaiting decision

    Partyman World Unit 9 The Boardwalk Lakeside Shopping Centre West Thurrock Way West Thurrock Essex RM20 2ZN

    External Building Alterations Comprising Replacement Windows

    11 Sep 2026 Full applications
  • 26/00765/FUL Granted

    133 Dock Road Tilbury Essex RM18 7BT

    Change of use from a 6 occupant HMO (use class C4) to a House of Multiple Occupancy for 7 occupants (Sui Generis).

    2 Jul 2026 Full applications
  • 26/00657/FUL Granted

    Bannatyne's Health Club And Spa Howard Road Chafford Hundred Grays Essex RM16 6YJ

    Installation of two additional rapid electric vehicle (EV) charging stations, together with associated CCTV infrastructure, reconfiguration of existing kerbing, and the creation of five car parking spaces

    12 Jun 2026 Full applications
  • 26/00799/FUL Refused

    2 First Avenue West Thurrock Essex RM20 3JR

    Demolition of the existing outbuilding(s) and erection of a detached three-bedroom dwelling to the rear of 2 First Avenue, with associated access, landscaping and ancillary works.

    9 Jul 2026 Full applications
  • 26/00404/FUL Granted

    ISO Tank Oliver Close West Thurrock Essex RM20 3EE

    Improved cleaning facilities and water filtration system(s) and minor internal alterations.

    10 Apr 2026 Full applications