Planning application
Land Adjacent Fen Farm Judds Farm And Part Of Bulphan Fen Harrow Lane Bulphan Essex
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application for non-material amendments to the details approved by condition 12 (archaeological work and mitigation) on planning permission 22/01145/CV (Application for the variation of condition nos. 5 (construction period) and 9 (HGV booking system) of planning permission ref 22/00552/CV (Application for the variation of condition no. 3 (time period and decommissioning) to extend the time period from 35 years to 40 years of planning permission ref. 21/00077/FUL (Installation of renewable led energy generating station comprising ground-mounted photovoltaic solar arrays and battery-based electricity storage containers together with substation, inverter/transformer stations, site accesses, grid connection cable, internal access tracks, security measures, access gates, other ancillary infrastructure, landscaping and biodiversity enhancements)
As published by the council, reference 24/01256/NMA
Application record
- Reference
- 24/01256/NMA
- Type
- Non Material Amendments
- Status
- Permitted
- Decision
- Approved
- Received
- 27 Nov 2024
- Validated
- 27 Nov 2024
- Decided
- 19 Dec 2024
- Ward
- OLD Orsett
- Decision by
- Chief Planning Officer Decision
Timeline
Dates from the published record
-
27 Nov 2024
Received by Thurrock
-
19 Dec 2024
Decision issued: Approved
-
2 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Bedford
146 applications on PlanIndex · across 56 councils · 93% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About amendments applications
How this application type works
An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.
Nearby applications
Within 500 metres
-
Land Adjacent Fen Farm Judds Farm And Part Of Bulphan Fen Harrow Lane Bulphan Essex
Application for the approval of details reserved by condition no 5 (construction period) of planning permission ref: 22/01145/CV (Application for the variation of condition nos. 5 (construction period) and 9 (HGV booking system) of planning permission ref 22/00552/CV (Application for the variation of condition no. 3 (time period and decommissioning) to extend the time period from 35 years to 40 years of planning permission ref. 21/00077/FUL (Installation of renewable led energy generating station comprising ground-mounted photovoltaic solar arrays and battery-based electricity storage containers together with substation, inverter/transformer stations, site accesses, grid connection cable, internal access tracks, security measures, access gates, other ancillary infrastructure, landscaping and biodiversity enhancements)) to inform Council of commencement
Granted Conditions -
Land Adjacent Fen Farm Judds Farm And Part Of Bulphan Fen Harrow Lane Bulphan Essex
Application for Non Material Amendment of planning permission 22/01145/CV (Application for the variation of condition nos. 5 (construction period) and 9 (HGV booking system) of planning permission ref 22/00552/CV (Application for the variation of condition no. 3 (time period and decommissioning) to extend the time period from 35 years to 40 years of planning permission ref. 21/00077/FUL (Installation of renewable led energy generating station comprising ground-mounted photovoltaic solar arrays and battery-based electricity storage containers together with substation, inverter/transformer stations, site accesses, grid connection cable, internal access tracks, security measures, access gates, other ancillary infrastructure, landscaping and biodiversity enhancements))) for revised layout of solar farm equipment, reduced size of ancillary buildings, changes to the fence and access track alignment, reduction of CCTV and changes to perimeter fence type.
Granted Amendments 11 docsSmall domestic -
Judds House Harrow Lane Bulphan RM14 3RE
Existing Outbuilding (Outbuilding 3)
Granted Lawful development 7 docs -
Judds House Harrow Lane Bulphan Essex RM14 3RE
Existing Outbuilding (Outbuilding 4)
Granted Lawful development 7 docs -
Judds House Harrow Lane Bulphan RM14 3RE
Application for Certificate of Lawfulness for Existing Outbuilding (Outbuilding 1)
Granted Lawful development 8 docs -
Judds House Harrow Lane Bulphan RM14 3RE
Continued occupation of dwelling by persons not solely, mainly or last employed in agriculture or forestry.
Granted Lawful development 5 docsDomestic
Other amendments applications
In Thurrock
-
26/00977/NMA Awaiting decision
1 St Clements Avenue West Thurrock Essex RM20 3BU
Application for a proposed non-material amendment to amend rear facing Bi-Fold doors and window arrangment of planning permission ref 26/00406/HHA (Single story rear extension with two skylights).
-
26/00951/NMA Awaiting decision
Bulk 250 Weston Avenue West Thurrock Essex RM20 3LJ
Application for non-material amendment to planning permission ref 25/00340/FUL (Use of the site for the storage of operational vehicles and associated external works, including the installation of ventilation louvres to the building elevations and the installation of ancillary infrastructure) to the proposed linage, location of the smoking shelter and the proposed ramps
-
26/00882/NMA Awaiting decision
North 2 Channel Close Stanford Le Hope Essex SS17 9FJ
Application for a proposed non-material amendment to amend the proposed layout of rooflights and photovoltaics of warehouse building of planning permission: 19/00306/LDOPND (London Gateway Logistics Park Local Development Order (LGLPLDO) Prior Notification of Development: Erection of a Class B8 warehouse and ancillary office accommodation, plot parking, loading, unloading and turning areas, site access and circulation roads and footpaths, plant room, service infrastructure, drainage, land-rai...
-
26/00875/NMA Awaiting decision
Alebex Logistics Central 3 North Sea Crossing Stanford Le Hope Essex SS17 9ER
Application for a proposed non-material amendment to proposed layout of photovoltaic solar panels of warehouse building roof. of planning permission ref 22/01357/LDOPND
-
26/00872/NMA Awaiting decision
Central 5 North Sea Crossing Stanford Le Hope Essex SS17 9ER
Application for a proposed non-material amendment to amend the PV layout on the roof of the warehouse approved under planning permission ref to 23/00821/LDOPND( London Gateway Logistics Park Local Development Order (LGLPLDO) Prior Notification of Development: Erection of a Class B8 warehouse and associated plot facilities and infrastructure )