Planning application
Emergency Access For Industrial Chemicals Hedley Avenue West Thurrock Essex
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Temporary use for maintenance purposes of an existing access at St Clements Road during 5 specified periods, until the end of April 2025
As published by the council, reference 24/00782/FUL
Application record
- Reference
- 24/00782/FUL
- Type
- Full Planning Permission Application
- Status
- Permitted
- Decision
- Approved
- Received
- 19 Jul 2024
- Validated
- 19 Jul 2024
- Decided
- 12 Sep 2024
- Ward
- OLD West Thurrock And South Stifford
- Decision by
- Chief Planning Officer Decision
Timeline
Dates from the published record
-
19 Jul 2024
Received by Thurrock
-
12 Sep 2024
Decision issued: Approved
-
19 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
170 applications on PlanIndex · across 31 councils · 94% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Emergency Access For Industrial Chemicals Hedley Avenue West Thurrock Essex
Application for a non-material amendment to planning application 24/00782/FUL (Temporary use for maintenance purposes of an existing access at St Clements Road during 5 specified periods, until the end of April 2025 to remove restriction on time limit for construction and increase HGV numbers) to amend condition 1 to alter the specified first dates in which the access road can be used for maintenance purposes
Granted Amendments 4 docs -
Industrial Chemicals Stoneness Road West Thurrock Essex RM20 3AG
Consultation on construction of a Polyaluminium Chloride Plant and storage building (Class B2/ B8), external storage tanks, bunds, vehicular circulation areas, drainage infrastructure and other ancillary works; this plant and its associated infrastructure and works will involve the processing and storage of the following Hazardous Substances: IChlor (Aluminium chloride) Part 1, Section E, Environmental Hazard, E1 (Vessel VSL025); Polyaluminium Chloride Solution 10% or 18% Part 1, Section E, Environmental Hazard, E1 (Vessel VSL026); Polyaluminium Chloride Solution 10% or 18% Part 1, Section E, Environmental Hazard, E1 (Vessel VSL027); Polyaluminium Chloride Solution 10% or 18% Part 1, Section E, Environmental Hazard, E1 (Vessel VSL028); Polyaluminium Chloride Solution 10% or 18% Part 1, Section E, Environmental Hazard, E1 (Vessel VSL029); Polyaluminium Chloride Solution 10% or 18% Part 1, Section E, Environmental Hazard, E1 (Vessel VSL030); Polyaluminium Chloride Solution 10% or 18% Part 1, Section E, Environmental Hazard, E1 (Vessel VSL031); Aluminium chloride hydroxide sulphate Part 1, Section E, Environmental Hazard, E1 (Vessel VSL032); Polyaluminium Chloride Solution (High basicity product at 13%) Part 1, Section E, Environmental Hazard, E1 (Vessel VSL033); Polyaluminium Chloride Solution (High basicity product at 13%) Part 1, Section E, Environmental Hazard, E1 (Vessel VSL034). within Thurrock Council
Decided 1 doc -
Industrial Chemicals Stoneness Road West Thurrock Essex RM20 3AG
Consultation on construction of a Polyaluminium Chloride Plant and storage building (Class B2/ B8), external storage tanks, bunds, vehicular circulation areas, drainage infrastructure and other ancillary works; this plant and its associated infrastructure and works will involve the processing and storage of the following Hazardous Substances: IChlor (Aluminium chloride) Part 1, Section E, Environmental Hazard, E1 (Vessel VSL025); Polyaluminium Chloride Solution 10% or 18% Part 1, Section E, Environmental Hazard, E1 (Vessel VSL026); Polyaluminium Chloride Solution 10% or 18% Part 1, Section E, Environmental Hazard, E1 (Vessel VSL027); Polyaluminium Chloride Solution 10% or 18% Part 1, Section E, Environmental Hazard, E1 (Vessel VSL028); Polyaluminium Chloride Solution 10% or 18% Part 1, Section E, Environmental Hazard, E1 (Vessel VSL029); Polyaluminium Chloride Solution 10% or 18% Part 1, Section E, Environmental Hazard, E1 (Vessel VSL030); Polyaluminium Chloride Solution 10% or 18% Part 1, Section E, Environmental Hazard, E1 (Vessel VSL031); Aluminium chloride hydroxide sulphate Part 1, Section E, Environmental Hazard, E1 (Vessel VSL032); Polyaluminium Chloride Solution (High basicity product at 13%) Part 1, Section E, Environmental Hazard, E1 (Vessel VSL033); Polyaluminium Chloride Solution (High basicity product at 13%) Part 1, Section E, Environmental Hazard, E1 (Vessel VSL034). within Thurrock Council
Decided 1 doc -
Clifford Devlin Ltd Eurobase South Hedley Avenue West Thurrock Essex RM20 4AL
Application for the discharge of condition no: 4 (Flood Management Plan and Flood Evacuation) and no. 5 (Soft and Hard Landscaping) of planning permission ref: 21/00796/FUL (Relocation of existing single storey block, installation of a pre-fabricated two storey office block and change of use from Sui Generis Use (vehicle hire and associated facilities) to a mixed use comprising of uses falling within Use Classes B2, B8 and E(g) (light repair workshop, contractors plant, vehicle compound and office facilities for business support.)
Granted Conditions 6 docsSmall domestic -
Procter & Gamble Product Supply (Uk) Ltd Hedley Avenue West Thurrock Essex RM20 4AL
Construction of production warehouse (B2 use), plant and tanks with associated ancillary works
Granted Full applications 49 docs -
Industrial Chemicals Stoneness Road West Thurrock Essex RM20 3AG
Hazardous Substances Consent for the storage of 1,800 tonnes of hazardous substances classified as E1 Hazardous to the Aquatic Environment in Category Acute 1 or Chronic 1, as per Schedule 1 of The Planning (Hazardous Substances) Regulations 2015 [as amended]
Granted Other 19 docs
Other full applications applications
In Thurrock
-
26/01027/FUL Awaiting decision
Essex Partnership University NHS Trust Thurrock Community Hospital Long Lane Stifford Clays Grays Essex RM16 2PX
Retention on a permanent basis of 2 storage containers established under previous temporary consent (Ref: 24/00962/FUL).
-
26/00996/FUL Awaiting decision
Rear Of 16 London Road Stanford Le Hope Essex SS17 0LD
Material changes to the previously approved planning application for first floor rear extension, previous planning application ref. 18/00343/ful.
-
26/00990/FUL Awaiting decision
Unit 8 Thurrock Shopping Park Weston Avenue West Thurrock Essex RM20 3LP
Change of use from retail use (Use Class E(a)) to restaurant and hot food takeaway use (sui generis) including external alterations and extension to existing building, external seating area, plant enclosure and bin store, provision of drive through lane and alterations to car parking and landscaping
-
26/00988/FUL Awaiting decision
Tilbury Riverside Art Activity Centre Ferry Road Tilbury Essex RM18 7NJ
Installation of a freestanding interpretation finger post sculpture with integrated bench (corten steel and Iroko timber) within the eastern external terrace area, together with two associated external spotlights for illumination of the structure, two wall-mounted entrance lights, and two freestanding lamp posts within the terrace.
-
26/00986/FUL Awaiting decision
St Cleres School Butts Lane Stanford Le Hope Essex SS17 0NW
Demolition of five school blocks; refurbishment of one school block; construction of two new secondary education buildings and external plant room; reconfiguration of parking arrangements; provision of a new MUGA; associated hard and soft landscaping and ancillary works.