Skip to content
PlanIndex Get alerts
Menu

Planning application

158 Lenthall Avenue Grays Essex RM17 5AB

Granted Thurrock 23/00204/FUL Full Planning Permission Application

Works: New dwelling Extension Loft or dormer Several homes

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension, loft conversion with a rear dormer and change of use to 2No. flats

As published by the council, reference 23/00204/FUL

Application record

Reference
23/00204/FUL
Type
Full Planning Permission Application
Status
Permitted
Decision
Approved
Received
18 Feb 2023
Validated
18 Feb 2023
Decided
3 May 2023
Ward
OLD Grays Thurrock
Decision by
Chief Planning Officer Decision
Postcode
RM17 5AB

Timeline

Dates from the published record

  1. 18 Feb 2023

    Received by Thurrock

  2. 3 May 2023

    Decision issued: Approved

  3. 2 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 158 Lenthall Avenue Grays Essex RM17 5AB

    22/01641/FUL Submitted 8 Dec 2022 0m away

    Single storey rear extension, loft conversion with a rear dormer and change of use to 2No. flats

    Refused Full applications New dwelling Extension +1 10 docs
    Several homes
  • 255 Lodge Lane Grays Essex RM17 5PX

    21/00647/HHA Submitted 20 Apr 2021 102m away

    Single storey rear and side extension

    Granted Householder Extension 7 docs
    Small domestic
  • 289 Lodge Lane Grays Essex RM17 5PR

    24/00961/HHA Submitted 10 Sep 2024 155m away

    Loft conversion with two pitched dormers on the front roof slope. Three skylights on the rear roof slope and two skylights on the existing gable protection. Raise ridge height of main dwelling.

    Granted Householder Loft or dormer Roofing 14 docs
    Domestic
  • 210 Lodge Lane Grays Essex RM16 2TH

    22/01625/CLOPUD Submitted 3 Dec 2022 155m away

    Proposed dormer loft conversion

    Refused Lawful development Loft or dormer 15 docs
  • 210 Lodge Lane Grays Essex RM16 2TH

    24/01145/CLOPUD Submitted 24 Oct 2024 155m away

    Convert the property from C3 to C4 (6 bed, max. occupants). The construction work will be the internal conversion works.

    Granted Lawful development 10 docs
  • 206 Lodge Lane Grays Essex RM16 2TP

    21/00865/PHA Submitted 20 May 2021 159m away

    Rear extension with a depth of 5 metres from the original rear wall of the property, with a maximum height of 4 metres and eaves height of 2.5 metres.

    Decided Prior approval Extension 7 docs

In Thurrock

  • 26/01027/FUL Awaiting decision

    Essex Partnership University NHS Trust Thurrock Community Hospital Long Lane Stifford Clays Grays Essex RM16 2PX

    Retention on a permanent basis of 2 storage containers established under previous temporary consent (Ref: 24/00962/FUL).

    1 Sep 2026 Full applications
  • 26/00996/FUL Awaiting decision

    Rear Of 16 London Road Stanford Le Hope Essex SS17 0LD

    Material changes to the previously approved planning application for first floor rear extension, previous planning application ref. 18/00343/ful.

    26 Aug 2026 Full applications
  • 26/00990/FUL Awaiting decision

    Unit 8 Thurrock Shopping Park Weston Avenue West Thurrock Essex RM20 3LP

    Change of use from retail use (Use Class E(a)) to restaurant and hot food takeaway use (sui generis) including external alterations and extension to existing building, external seating area, plant enclosure and bin store, provision of drive through lane and alterations to car parking and landscaping

    25 Aug 2026 Full applications
  • 26/00988/FUL Awaiting decision

    Tilbury Riverside Art Activity Centre Ferry Road Tilbury Essex RM18 7NJ

    Installation of a freestanding interpretation finger post sculpture with integrated bench (corten steel and Iroko timber) within the eastern external terrace area, together with two associated external spotlights for illumination of the structure, two wall-mounted entrance lights, and two freestanding lamp posts within the terrace.

    25 Aug 2026 Full applications
  • 26/00986/FUL Awaiting decision

    St Cleres School Butts Lane Stanford Le Hope Essex SS17 0NW

    Demolition of five school blocks; refurbishment of one school block; construction of two new secondary education buildings and external plant room; reconfiguration of parking arrangements; provision of a new MUGA; associated hard and soft landscaping and ancillary works.

    25 Aug 2026 Full applications