London Gateway Port Ltd Site F The Manorway Coryton Essex SS17 9DP
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Retention of two single storey prefabricated office & driver welfare buildings ancillary to the existing HGV parking area for a period of 10 years, & provision of a fuel storage tank, refuelling area, sub - surface fuel retention separator & associated drainage infrastructure, including new manholes & ditch headwall & related engineering operations."
As published by the council, reference 21/00897/FUL
Application record
- Reference
- 21/00897/FUL
- Type
- Full Planning Permission Application
- Status
- Permitted
- Decision
- Approved
- Received
- 26 May 2021
- Validated
- 3 Jun 2021
- Decided
- 29 Jul 2021
- Ward
- OLD Stanford Le Hope West
- Decision by
- Chief Planning Officer Decision
- Postcode
- SS17 9DP
Timeline
Dates from the published record
-
26 May 2021
Received by Thurrock
-
3 Jun 2021
Validated
Checked as complete and ready for consideration.
-
29 Jul 2021
Decision issued: Approved
-
28 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Colchester
3 applications on PlanIndex · across 2 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Thurrock granted permission on 29 July 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
South 3 Pacific Avenue Stanford Le Hope Thurrock SS17 9FA
Installation of a single-storey demountable temporary office building with ancillary space for a temporary period terminating on or before 31.12.2026
Granted Full applications 9 docsSmall domestic
Other full applications
In Thurrock
-
26/01027/FUL Awaiting decision
Essex Partnership University NHS Trust Thurrock Community Hospital Long Lane Stifford Clays Grays Essex RM16 2PX
Retention on a permanent basis of 2 storage containers established under previous temporary consent (Ref: 24/00962/FUL).
-
26/01017/FUL Awaiting decision
Telephone Exchange London Road Aveley Essex RM15 4XU
Installation of a new cable trench, electrical secondary distribution substation within a GRP enclosure and electrical panel within a GRP enclosure, together with partial demolition of the existing fuel tank annex enclosure and extension of the existing concrete plinth by approximately 1.75m
-
26/00996/FUL Awaiting decision
Rear Of 16 London Road Stanford Le Hope Essex SS17 0LD
Material changes to the previously approved planning application for first floor rear extension, previous planning application ref. 18/00343/ful.
-
26/01000/FUL Awaiting decision
Artistic Signs The Laurels Lower Dunton Road Horndon On The Hill Essex SS17 8QD
Demolition of the existing conservatory and outbuildings and erect extension to existing house and 2 new build dwellings and associated landscaping
-
26/00990/FUL Awaiting decision
Unit 8 Thurrock Shopping Park Weston Avenue West Thurrock Essex RM20 3LP
Change of use from retail use (Use Class E(a)) to restaurant and hot food takeaway use (sui generis) including external alterations and extension to existing building, external seating area, plant enclosure and bin store, provision of drive through lane and alterations to car parking and landscaping