Planning application
96 Ashridge Drive South Oxhey Watford Hertfordshire WD19 6UQ
Works: Loft or dormer Domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Variation of Conditions 2 (Plans) and 5 (Parking Spaces) pursuant to planning permission 24/1992/FUL to allow alterations to the rear dormer, internal alterations, conversion to a three bedroom dwelling, alterations to the boundary, alterations to landscaping and driveway
As published by the council, reference 26/1217/FUL
Application record
- Reference
- 26/1217/FUL
- Category
- Full applications
- Status
- Pending Consideration
- Received
- 29 Jul 2026
- Validated
- 31 Jul 2026
- Postcode
- WD19 6UQ
Timeline
Dates from the published record
-
29 Jul 2026
Received by Three Rivers
-
31 Jul 2026
Validated
Checked as complete and ready for consideration.
-
8 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 25 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Three Rivers took a median of 56 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Three Rivers for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
96 Ashridge Drive South Oxhey Watford Hertfordshire WD19 6UQ
Subdivision of existing dwelling to provide 2no. self-contained flats; erection of a part single-storey, part two-storey rear extension; single-storey front extension; loft conversion including rear dormer and front rooflights; alterations to fenestration; associated internal alterations; alterations to raise front driveway; widening of existing vehicle crossover; cycle and refuse storage; and associated landscaping alterations.
Granted Full applications New dwelling Extension +2 37 docsSmall domestic -
96 Ashridge Drive South Oxhey Watford Hertfordshire WD19 6UQ
Subdivision of site and construction of a two-storey detached dwelling including loft accommodation served by a rear dormer window, front solar panels; provision of hardstanding and associated landscaping; and new vehicular access including dropped kerb.
Granted Full applications New dwelling Loft or dormer +1 46 docsSmall domestic -
111 Ashridge Drive South Oxhey Watford Hertfordshire WD19 6UH
Prior Approval: Single storey rear extension (depth 6.00 metres, maximum height 3.00 metres, maximum eaves height 3.00 metres)
Granted Outline Extension 3 docsSmall domestic -
113 Ashridge Drive South Oxhey Watford Hertfordshire WD19 6UH
Prior Approval: Single storey rear extension (depth 6.00 metres, maximum height 3.00 metres, maximum eaves height 3.00 metres)
Granted Outline Extension 3 docsSmall domestic -
74 Barnhurst Path South Oxhey Watford Hertfordshire WD19 6UD
Part Retrospective: Erection of dropped kerb and alterations to front hardstanding including raised driveway and construction of front porch.
Refused Amendments Extension 11 docsSmall domestic -
19 Doncaster Green South Oxhey Hertfordshire WD19 6UF
Certificate of Lawfulness Proposed Development: Loft conversion including hip to gable roof extension with rear dormer and front rooflights
Granted Lawful development Extension Loft or dormer 10 docs
Other full applications applications
In Three Rivers
-
26/1384/FUL Awaiting decision
Swandrift Trout Rise Loudwater Rickmansworth Hertfordshire WD3 4JZ
Demolition of existing conservatory and construction of part single, part two storey rear extension, single storey side extension, extension to double garage to create first floor above with front/rear dormer windows; loft conversion including front/rear dormer windows and side/rear rooflights; construction of basement, rear balcony, new window to side elevation, patio extension and landscaping alterations including ramp.
-
26/1380/FUL Awaiting decision
Crossley Wylde Loudwater Lane Loudwater Rickmansworth Hertfordshire WD3 3JD
Installation of rooflights
-
26/1372/FUL Awaiting decision
108 Winton Drive Croxley Green Rickmansworth Hertfordshire WD3 3QT
Demolition of existing conservatory and side extension; construction of a single storey front, side and rear extension with rooflights
-
26/1365/FUL Awaiting decision
Morningside Bridle Lane Loudwater Rickmansworth Hertfordshire WD3 4JB
Construction of a single storey rear extension; conversion of garage into habitable accommodation; alterations to the fenestration
-
26/1358/FUL Awaiting decision
251 Baldwins Lane Croxley Green Rickmansworth Hertfordshire WD3 3LH
Variation of Condition 3 (Materials) Pursuant to planning permission 25/1526/RSP to allow alterations to materials.