Planning application
24/0097/FUL
40 Long Lane Mill End Rickmansworth Hertfordshire WD3 8YF
Proposal
Construction of single storey side/ rear extension.
As published by the council, reference 24/0097/FUL
Timeline
Dates from the published record
-
22 Jan 2024
Received by Three Rivers
-
24 Jan 2024
Validated
Checked as complete and ready for consideration.
-
11 Mar 2024
Decision issued: approved
-
1 Aug 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
22/0737/TPO Granted
Long Lane Mill End Hertfordshire
Trees x 2 - Remove overhanging branches that are overhanging the path and road Crown lift overhanding branches to 3.5 m that are hanging over the path and road on both oak trees as shown in the attached photos. Also a crown reduction to both trees to maintain a balanced shape of 2.5m on either side of the tree.
-
26/0986/FUL Awaiting decision
76 Eastwick Crescent Mill End Rickmansworth Hertfordshire WD3 8YJ
Demolition of existing storage building conservatory; construction of rear and side extension; alterations to fenestration, including construction of front bay window; construction of side and rear dormers and front roof lights
-
23/1907/FUL Granted
74 Eastwick Crescent Mill End Rickmansworth Hertfordshire WD3 8YJ
Construction of single storey side and rear extension.
-
26/0683/FUL Granted
6 And 8 Eastwick Crescent Mill End Rickmansworth Hertfordshire WD3 8YJ
Joint Application: Construction of first floor side extension, loft conversion including hip to gable roof extension, with rear dormer and front rooflights to 6 and 8 Eastwick Crescent, Construction of single storey rear extension to 6 Eastwick Crescent
-
24/0172/CLPD Granted
32 Eastwick Crescent Mill End Rickmansworth Hertfordshire WD3 8YJ
Certificate of Lawfulness Proposed Development: Loft conversion including hip to gable roof extension, rear dormer window, flank window and front rooflights.
-
22/0874/FUL Granted
82 Long Lane Mill End Hertfordshire WD3 8YG
Single and two storey front extension
Other full applications applications
In Three Rivers
-
26/0935/FUL Granted
53 St Marys Avenue Northwood HA6 3AY
Construction of single storey rear extension with roof lantern, installation of window to side elevation
-
26/0889/FUL Granted
Clovelly Bell Lane Bedmond Abbots Langley Hertfordshire WD5 0QS
Demolition of existing conservatory and construction of single storey rear extension with pergola, rear patio, and sedum roof, solar panels and rooflights; alterations to side fenestration; alteration to external materials of front elevation including render
-
26/0816/FUL Granted
25 Beacon Way Rickmansworth Hertfordshire WD3 7PF
Loft conversion including increase in ridge height with rear dormer and front/side rooflights
-
26/1015/FUL Granted
32 Tudor Manor Gardens Garston Watford Hertfordshire WD25 9TQ
Variation of Condition 2 (Plans) pursuant to planning permission 25/1939/FUL to allow a reduction to the first floor extension; associated alterations to the fenestration.
-
26/1196/FUL Awaiting decision
22 Main Avenue Moor Park Northwood Hertfordshire HA6 2HJ
Construction of two outbuildings to rear of shop.