Planning application
22/0489/FUL
Nasus Dunny Lane Belsize Hertfordshire WD4 9DE
Proposal
Loft conversion including hip to gable roof alterations, front and rear dormer windows and front rooflights, front porch, single and two storey rear extensions
As published by the council, reference 22/0489/FUL
Timeline
Dates from the published record
-
16 Mar 2022
Received by Three Rivers
-
25 Mar 2022
Validated
Checked as complete and ready for consideration.
-
19 May 2022
Decision issued: approved
-
24 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
23/2164/FUL Granted
Ashlea Dunny Lane Belsize Kings Langley Hertfordshire WD4 9DE
Construction of ground floor rear infill extension; extension to loft accommodation including roof extension; flank and rear rooflights; and alterations to fenestration
-
24/0084/FUL Granted
Treelings Dunny Lane Belsize Kings Langley Hertfordshire WD4 9DQ
Demolition of existing conservatory and construction of single storey side and rear extension; alterations to existing dormers including removal of front dormer and replacement with two dormers and front rooflight; removal of existing greenhouse and rear extension to existing outbuilding, extension of rear patio; alterations to front landscaping works including provision of stepped access, front driveway and parking.
-
24/0098/FUL Granted
Winchwood Windmill Hill Chipperfield Kings Langley Hertfordshire WD4 9DA
Demolition of existing sheds and erection of carport and garage building with EV charging point.
-
25/1504/CLPD Granted
Tarn Dunny Lane Belsize Kings Langley Hertfordshire WD4 9DQ
Certificate of Lawfulness Proposed Development: Enlargement of the dwellinghouse by the construction of one additional storey and single storey rear extension
-
20/1743/FUL Refused
Holly Hedges Farm Olleberrie Lane Belsize WD3 4NU
Demolition of existing dwelling and construction of a replacement two storey dwelling including alterations to land levels
-
26/0670/FUL Refused
Belsize House Plough Lane Sarratt Rickmansworth Hertfordshire WD3 4QP
Construction of part-single, part two storey rear extension and side porch, replacement of windows and removal of oil tank
Other full applications applications
In Three Rivers
-
26/0935/FUL Granted
53 St Marys Avenue Northwood HA6 3AY
Construction of single storey rear extension with roof lantern, installation of window to side elevation
-
26/0889/FUL Granted
Clovelly Bell Lane Bedmond Abbots Langley Hertfordshire WD5 0QS
Demolition of existing conservatory and construction of single storey rear extension with pergola, rear patio, and sedum roof, solar panels and rooflights; alterations to side fenestration; alteration to external materials of front elevation including render
-
26/0816/FUL Granted
25 Beacon Way Rickmansworth Hertfordshire WD3 7PF
Loft conversion including increase in ridge height with rear dormer and front/side rooflights
-
26/1015/FUL Granted
32 Tudor Manor Gardens Garston Watford Hertfordshire WD25 9TQ
Variation of Condition 2 (Plans) pursuant to planning permission 25/1939/FUL to allow a reduction to the first floor extension; associated alterations to the fenestration.
-
26/1196/FUL Awaiting decision
22 Main Avenue Moor Park Northwood Hertfordshire HA6 2HJ
Construction of two outbuildings to rear of shop.