Skip to content
PlanIndex Get alerts
Menu

Planning application

22 Rosehill Gardens Abbots Langley WD5 0HF

Granted Three Rivers 22/0350/FUL Full Application

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension and alterations to fenestration detail

As published by the council, reference 22/0350/FUL

Application record

Reference
22/0350/FUL
Type
Full Application
Status
Decided
Decision
approved
Received
28 Feb 2022
Validated
9 Mar 2022
Decided
3 May 2022
Ward
Gade Valley
Parish
Abbots Langley Parish Council
Decision by
Delegated Decision
Postcode
WD5 0HF

Timeline

Dates from the published record

  1. 28 Feb 2022

    Received by Three Rivers

  2. 9 Mar 2022

    Validated

    Checked as complete and ready for consideration.

  3. 3 May 2022

    Decision issued: approved

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 16 Hazelbury Avenue Abbots Langley Hertfordshire WD5 0DF

    22/1180/FUL Submitted 21 Jun 2022 37m away

    Single-storey rear infill extension and alterations to roof of existing rear extension

    Granted Full applications Extension 6 docs
    Small domestic
  • 31 Rosehill Gardens Abbots Langley Hertfordshire WD5 0HF

    26/1163/FUL Submitted 17 Jul 2026 63m away

    90% historically approved · decision due ~8 Oct

    Construction of single storey front and rear extensions and flat roofing infill to side

    Awaiting decision Full applications Extension
    Small domestic
  • 2 Hazelbury Avenue Abbots Langley Hertfordshire WD5 0DF

    23/1756/FUL Submitted 16 Oct 2023 83m away

    Construction of part single, part two storey rear and side extension; alterations to fenestration; removal of chimney; and extension to driveway

    Granted Full applications Extension Windows or glazing 14 docs
  • 3 Hazelbury Avenue Abbots Langley Hertfordshire WD5 0DE

    25/1644/FUL Submitted 23 Sep 2025 84m away

    Construction of single-storey rear extension, raised patio, and associated fencing.

    Granted Full applications Extension 13 docs
    Small domestic
  • 5 Hazelbury Avenue Abbots Langley Hertfordshire WD5 0DE

    21/0805/TPO Submitted 26 Mar 2021 85m away

    Cypress - reduce to sound wood and balance by height reduction of 5m all round - excessive shading

    Refused Trees 4 docs
  • Cobwebs 1B Hazelbury Avenue Abbots Langley Hertfordshire WD5 0DE

    22/1587/CLPD Submitted 19 Aug 2022 101m away

    Certificate of Lawfulness Proposed Development: Demolition of existing conservatory and construction of two storey rear extension and front porch extension; loft conversion including rear dormer, front rooflights and solar panels; addition of new window to side elevation and internal alterations

    Granted Lawful development Extension Loft or dormer +2 8 docs
    Small domestic

In Three Rivers

  • 26/1384/FUL Awaiting decision

    Swandrift Trout Rise Loudwater Rickmansworth Hertfordshire WD3 4JZ

    Demolition of existing conservatory and construction of part single, part two storey rear extension, single storey side extension, extension to double garage to create first floor above with front/rear dormer windows; loft conversion including front/rear dormer windows and side/rear rooflights; construction of basement, rear balcony, new window to side elevation, patio extension and landscaping alterations including ramp.

    31 Aug 2026 Full applications
  • 26/1372/FUL Awaiting decision

    108 Winton Drive Croxley Green Rickmansworth Hertfordshire WD3 3QT

    Demolition of existing conservatory and side extension; construction of a single storey front, side and rear extension with rooflights

    27 Aug 2026 Full applications
  • 26/1365/FUL Awaiting decision

    Morningside Bridle Lane Loudwater Rickmansworth Hertfordshire WD3 4JB

    Construction of a single storey rear extension; conversion of garage into habitable accommodation; alterations to the fenestration

    25 Aug 2026 Full applications
  • 26/1358/FUL Awaiting decision

    251 Baldwins Lane Croxley Green Rickmansworth Hertfordshire WD3 3LH

    Variation of Condition 3 (Materials) Pursuant to planning permission 25/1526/RSP to allow alterations to materials.

    24 Aug 2026 Full applications
  • 26/1359/FUL Awaiting decision

    36 Girton Way Croxley Green Rickmansworth Hertfordshire WD3 3QN

    Construction of single storey rear extension; alterations to landscaping including demolition of outbuilding and construction of outdoor kitchen; internal alterations

    24 Aug 2026 Full applications