Planning application
91 Hampermill Lane Oxhey Hall Watford Hertfordshire WD19 4NX
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a single storey side and rear extension
As published by the council, reference 21/2868/FUL
Application record
- Reference
- 21/2868/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- approved
- Received
- 17 Dec 2021
- Validated
- 6 Jan 2022
- Decided
- 1 Apr 2022
- Ward
- Oxhey Hall And Hayling
- Parish
- Watford Rural Parish Council
- Decision by
- Delegated Decision
- Postcode
- WD19 4NX
Timeline
Dates from the published record
-
17 Dec 2021
Received by Three Rivers
-
6 Jan 2022
Validated
Checked as complete and ready for consideration.
-
1 Apr 2022
Decision issued: approved
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
91 Hampermill Lane Oxhey Hall Watford Hertfordshire WD19 4NX
Erection of a single storey side and rear extension and alterations to fenestration
Granted Full applications Extension Windows or glazing 9 docsSmall domestic -
91 Hampermill Lane Oxhey Hall Hertfordshire WD19 4NX
Certificate of Lawfulness Proposed Development: Erection of detached garage/gym
Granted Lawful development 6 docs -
89 Hampermill Lane Oxhey Hall Watford Hertfordshire WD19 4NT
Part Retrospective: Demolition of existing front porch and erection of front porch; construction of first floor side extension, part single, part two storey rear extension; provision of rear juliet balcony, alterations to entrance door; internal alterations, addition of window to side elevation, replacement of windows, alterations to patio and associated rear landscaping works.
Granted Full applications Extension Demolition +1 15 docsSmall domestic -
89 Hampermill Lane Oxhey Hall Watford Hertfordshire WD19 4NT
Part Retrospective: Demolition of existing front porch and erection of front porch; construction of first floor side extension, part single, part two storey rear extension; provision of rear juliet balcony, alterations to entrance door; internal alterations, addition of window to side elevation, replacement of windows, alterations to patio and associated rear landscaping works.
Granted Amendments Extension Demolition +1 15 docsSmall domestic -
89 Hampermill Lane Oxhey Hall Watford Hertfordshire WD19 4NT
Demolition of existing front porch and erection of front porch; construction of single storey rear extension with sedum roof, two storey rear extension; alterations to existing side projection, rear juliet balcony and rear rooflight, alterations to entrance door; internal alterations, addition of window to side elevation, replacement of windows, alterations to patio and associated rear landscaping works.
Granted Full applications Extension Loft or dormer +2 17 docsSmall domestic -
97 Hampermill Lane Oxhey Hall Watford Hertfordshire WD19 4NX
Demolition of existing conservatory and construction of single storey rear extension.
Granted Full applications Extension Demolition 11 docsSmall domestic
Other full applications applications
In Three Rivers
-
26/1384/FUL Awaiting decision
Swandrift Trout Rise Loudwater Rickmansworth Hertfordshire WD3 4JZ
Demolition of existing conservatory and construction of part single, part two storey rear extension, single storey side extension, extension to double garage to create first floor above with front/rear dormer windows; loft conversion including front/rear dormer windows and side/rear rooflights; construction of basement, rear balcony, new window to side elevation, patio extension and landscaping alterations including ramp.
-
26/1380/FUL Awaiting decision
Crossley Wylde Loudwater Lane Loudwater Rickmansworth Hertfordshire WD3 3JD
Installation of rooflights
-
26/1372/FUL Awaiting decision
108 Winton Drive Croxley Green Rickmansworth Hertfordshire WD3 3QT
Demolition of existing conservatory and side extension; construction of a single storey front, side and rear extension with rooflights
-
26/1365/FUL Awaiting decision
Morningside Bridle Lane Loudwater Rickmansworth Hertfordshire WD3 4JB
Construction of a single storey rear extension; conversion of garage into habitable accommodation; alterations to the fenestration
-
26/1358/FUL Awaiting decision
251 Baldwins Lane Croxley Green Rickmansworth Hertfordshire WD3 3LH
Variation of Condition 3 (Materials) Pursuant to planning permission 25/1526/RSP to allow alterations to materials.