Skip to content
PlanIndex Get alerts
Menu

Planning application

Sarum Templepan Lane Chandlers Cross WD3 4NH

Refused Three Rivers 20/2313/FUL Full Application

Works: Demolition Domestic

Read from the description, not a valuation. How we read the register

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Demolition of existing dwelling, annexe and garage buildings, and erection of replacement dwelling with linked annexe and garage, and associated works.

As published by the council, reference 20/2313/FUL

Application record

Reference
20/2313/FUL
Type
Full Application
Status
Decided
Decision
refused
Received
2 Nov 2020
Validated
4 Nov 2020
Decided
30 Dec 2020
Ward
Chorleywood North And Sarratt
Parish
Sarratt Parish Council
Decision by
Delegated Decision
Postcode
WD3 4NH

Timeline

Dates from the published record

  1. 2 Nov 2020

    Received by Three Rivers

  2. 4 Nov 2020

    Validated

    Checked as complete and ready for consideration.

  3. 30 Dec 2020

    Decision issued: refused

  4. 8 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

25 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Sarum Templepan Lane Chandlers Cross WD3 4NH

    20/2276/FUL Submitted 28 Oct 2020 4m away

    Demolition of existing garage and existing annexe and construction of replacement garage and annexe buildings

    Granted Full applications Demolition 16 docs
  • Green Hedges Templepan Lane Chandlers Cross WD3 4NH

    20/2171/TPO Submitted 14 Oct 2020 259m away

    T1 and T2 - x 2 Oak to be crown and lifted by 0.5m above ridge (garage roof) T3 x 1 Oak - To be removed as was struck by lightening and is pretty dead. This was instructed to you by a lady inspector who last visited

    Granted Trees 10 docs
  • Barn Potten Farm Chandlers Lane Chandlers Cross Hertfordshire

    25/0943/FUL Submitted 2 Jun 2025 298m away

    Change of use of barn to studio unit (Use Class E); addition of fenestration and internal alterations

    Withdrawn Full applications Windows or glazing 19 docs
  • Potten Farm, Stables Chandlers Lane Chandlers Cross WD3 4NQ

    21/2612/FUL Submitted 11 Nov 2021 354m away

    Variation of Condition 2 (Approved Plans) pursuant to planning permission 18/0454/FUL (Change of use of part of site from equestrian including demolition of existing stables and barn, construction of replacement buildings and conversion of stables to be used as craft/artisan workshop units with associated parking) to amend layout including hard and soft landscaping

    Granted Full applications Demolition 14 docs
  • Potten Farm, Stables Chandlers Lane Chandlers Cross WD3 4NQ

    21/2611/DIS Submitted 11 Nov 2021 354m away

    Discharge of Condition 5 (Landscaping), Condition 6 (Landscape Management), Condition 7 (Management Plan) and Condition 8 (Boundary Treatment) pursuant to planning permission 18/0454/FUL

    Decided Conditions 19 docs
  • Barn Potten Farm Chandlers Lane Chandlers Cross Hertfordshire

    25/0944/LBC Submitted 2 Jun 2025 363m away

    Listed Building Consent: Change of use of barn to studio unit (Use Class E); addition of fenestration and internal alterations

    Withdrawn Heritage and listed buildings Windows or glazing 23 docs

In Three Rivers

  • 26/1384/FUL Awaiting decision

    Swandrift Trout Rise Loudwater Rickmansworth Hertfordshire WD3 4JZ

    Demolition of existing conservatory and construction of part single, part two storey rear extension, single storey side extension, extension to double garage to create first floor above with front/rear dormer windows; loft conversion including front/rear dormer windows and side/rear rooflights; construction of basement, rear balcony, new window to side elevation, patio extension and landscaping alterations including ramp.

    31 Aug 2026 Full applications
  • 26/1372/FUL Awaiting decision

    108 Winton Drive Croxley Green Rickmansworth Hertfordshire WD3 3QT

    Demolition of existing conservatory and side extension; construction of a single storey front, side and rear extension with rooflights

    27 Aug 2026 Full applications
  • 26/1365/FUL Awaiting decision

    Morningside Bridle Lane Loudwater Rickmansworth Hertfordshire WD3 4JB

    Construction of a single storey rear extension; conversion of garage into habitable accommodation; alterations to the fenestration

    25 Aug 2026 Full applications
  • 26/1358/FUL Awaiting decision

    251 Baldwins Lane Croxley Green Rickmansworth Hertfordshire WD3 3LH

    Variation of Condition 3 (Materials) Pursuant to planning permission 25/1526/RSP to allow alterations to materials.

    24 Aug 2026 Full applications
  • 26/1359/FUL Awaiting decision

    36 Girton Way Croxley Green Rickmansworth Hertfordshire WD3 3QN

    Construction of single storey rear extension; alterations to landscaping including demolition of outbuilding and construction of outdoor kitchen; internal alterations

    24 Aug 2026 Full applications