Skip to content
PlanIndex Get alerts
Menu

Planning application

Ivy House Farm Ivy Lane Lowestoft Suffolk NR33 8HY

Granted The Broads Authority BA/2022/0235/AGR Agricultural/Forestry Development

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Agricultural barn

As published by the council, reference BA/2022/0235/AGR

Application record

Reference
BA/2022/0235/AGR
Type
Agricultural/Forestry Development
Status
Permitted
Decision
Prior Approval Granted
Received
1 Jul 2022
Validated
11 Jul 2022
Decided
14 Sep 2022
Ward
Carlton And Whitton Ward
Parish
Oulton Broad Parish Council
Decision by
Delegated Decision
Postcode
NR33 8HY

Site history

Applications at this address on the The Broads Authority register

This site has had 4 applications since 2022: 3 approved, 0 refused.

  • BA/2026/0188/TEL Awaiting decision

    Ivy House Farm Ivy Lane Lowestoft Suffolk NR33 8HY

    Regulation 5 Notice to install fixed line broadband electronic communications apparatus on land at Ivy House Farm, Lowestoft

    Submitted 14 Jul 2026 Telecoms
  • Ivy House Farm Ivy Lane Lowestoft Suffolk NR33 8HY

    Changes to window locations, non-material amendment to permission BA/2024/0221/FUL

    Decided 10 Feb 2026 Amendments
  • Ivy House Farm Ivy Lane Lowestoft Suffolk NR33 8HY

    Erection of day room in connection with the existing stables and barn

    Decided 24 Oct 2024 Full applications

Timeline

Dates from the published record

  1. 1 Jul 2022

    Received by The Broads Authority

  2. 11 Jul 2022

    Validated

    Checked as complete and ready for consideration.

  3. 14 Sep 2022

    Decision issued: Prior Approval Granted

  4. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

12 applications on PlanIndex · across 5 councils · 83% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

The Broads Authority granted permission on 14 September 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 500 metres

In The Broads Authority

  • Valley Farm Low Road Mettingham Suffolk NR35 1TS

    Steel portal frame building for storage of straw. See statement and drawings for full details.

    29 Jan 2026 Other
  • The Long House Low Road Mettingham Suffolk NR35 1TS

    The scheme includes the undergrounding of 1 span of LV overhead line.

    11 Aug 2025 Other
  • Low Farm 9 Low Road South Walsham Norwich Norfolk NR13 6EQ

    Underground cable works

    28 Oct 2024 Other
  • Shrublands Farm Grays Road Burgh St Peter Norfolk NR34 0BB

    Open fronted barn

    7 Aug 2024 Other
  • Field 100M South Of Old Methodist Church Reedham Road Cantley NR13 3LQ

    A balanced cut and fill earth moving operation to reconstruct and enlarge the existing harvesting reservoir which was not originally constructed to any engineering design or standards that today would be expected. Why necessary for agriculture: Vegetable production to the higher light land to the north requires up to 200mm of irrigation in a drought year, the existing reservoir is poorly engineered and of insufficient size to harvest the available water from the roofs of the farm buildings to the south east. For many years the farm has relied on the harvested water for its irrigation, in 2022 the farm ran out of water early in the irrigation season. Why designed for agriculture: There is an existing pumping and underground pipeline infrastructure to the irrigated light land.

    11 Nov 2022 Other