Ashchurch Business Centre Alexandra Way Ashchurch Tewkesbury Gloucestershire GL20 8NB
Works: Loft or dormer Roofing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Refurbishment of industrial units to include, overlaying of existing roofs including new roof lights and insulation, respraying of external elevations and installation of new roller shutters in existing openings.
As published by the council, reference 26/00510/FUL
Application record
- Reference
- 26/00510/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Permit
- Received
- 17 Jun 2026
- Validated
- 6 Jul 2026
- Decided
- 4 Aug 2026
- Ward
- Northway
- Parish
- Northway
- Decision by
- Delegated Decision
- Postcode
- GL20 8NB
Timeline
Dates from the published record
-
17 Jun 2026
Received by Tewkesbury
-
6 Jul 2026
Validated
Checked as complete and ready for consideration.
-
4 Aug 2026
Decision issued: Permit
-
9 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Unit 5E Alexandra Way Ashchurch Tewkesbury Gloucestershire GL20 8NB
88% historically approved · decision due ~15 Oct
Proposed new customer access door with associated internal alterations
Awaiting decision Full applications 5 docs -
Unit C Alexandra Way Ashchurch Tewkesbury Gloucestershire GL20 8NB
88% historically approved · decision due ~1 Sep
Demolition of existing building and erection of a new single-storey Class E discount foodstore (2,185 sqm gross; 1,516 sqm net sales) with access, car parking and servicing areas, drainage, landscaping and associated works.
Awaiting decision Full applications Demolition 153 docsSmall domestic -
Ashvale 1 Alexandra Way Ashchurch Tewkesbury Gloucestershire GL20 8NB
Retrospective consent for internally illuminated and non-illuminated signage and totem sign.
Granted Advertising 14 docs -
Unit 5E Alexandra Way Ashchurch Tewkesbury Gloucestershire GL20 8NB
97% historically approved · decision due ~10 Sep
Advertisement Consent for installation of non-illuminated fascia sign
Awaiting decision Advertising 7 docs -
Ashvale 1 Alexandra Way Ashchurch Tewkesbury Gloucestershire GL20 8NB
Refurbishment of the existing buildings on-site and the change of use of 2no. building to B8 use (self-storage) and provision of 10no. drive up units
Granted Full applications 25 docs -
BP Garage Ashchurch Road Tewkesbury Gloucestershire GL20 8JN
88% historically approved · decision due ~7 Jul
Installation of 3no new electrical vehicle chargers with associated electrical infrastructure in existing petrol filing station car park.
Awaiting decision Full applications 21 docs
Other full applications applications
In Tewkesbury
-
26/00553/FUL Refused
6 Church Row Gretton Cheltenham Gloucestershire GL54 5HG
Two storey rear extension and alterations to front porch
-
26/00727/FUL Awaiting decision
Chaceley Hall Chaceley Hole Chaceley Gloucester Gloucestershire GL19 4EG
Erection of freestanding solar panels, battery storage and associated works, for domestic use
-
26/00720/FUL Awaiting decision
Medlar Cottage Walton Hill Deerhurst Gloucester Gloucestershire GL19 4BT
Construction of double garage.
-
26/00719/FUL Awaiting decision
Cleeve School Two Hedges Road Bishops Cleeve Cheltenham Gloucestershire GL52 8AE
Removal of condition 15 (Construction management plan). Variation of Condition 2 (Approved documents) of planning approval 25/00438/FUL for The construction of a new artificial grass pitch (AGP) with associated recesses, mesh fencing, LED lighting, acoustic barrier, hard standing paths and areas of soft landscaping to install the acoustic barrier approximately 200mm closer to the pitch than on the approved plans
-
26/00723/FUL Awaiting decision
The Woodleys Toddington Cheltenham Gloucestershire GL54 5BY
Proposed first floor garage extension