Planning application
Vigo Park Recreation Road Andover Hampshire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of bowling club and community pavilion, together with an integrated food and drink kiosk, public toilets and changing facilities, together with outdoor splash pad and associated structures, canopy, seating, and hard/soft landscaping
As published by the council, reference 26/01373/FULLN
Application record
- Reference
- 26/01373/FULLN
- Status
- Current
- Received
- 26 Jun 2026
- Validated
- 30 Jun 2026
- Ward
- ANDOVER ST MARYS
- Parish
- ANDOVER TOWN (ST MARYS)
Timeline
Dates from the published record
-
26 Jun 2026
Received by Test Valley
-
30 Jun 2026
Validated
Checked as complete and ready for consideration.
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 25 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Test Valley took a median of 51 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
DHA Planning Ltd Agent, a planning consultancy registered in Maidstone
Active · incorporated 1992 · Maidstone
407 applications on PlanIndex · across 56 councils · 93% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordTest Valley Borough Council Applicant
8 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
73 documents on file for this application
- NORTHERN AREA PLANNING COMMITTEE
- TREES (TVBC)
- ENVIRONMENTAL PROTECTION TEAM (TVBC)
- ARCHAEOLOGY - WILTSHIRE COUNCIL
- SPORT ENGLAND
- ECOLOGY
- AMENDED - TREE RETENTION AND PROTECTION PLAN (1/6)
- AMENDED - TREE RETENTION AND PROTECTION PLAN (2/6)
- AMENDED - TREE RETENTION AND PROTECTION PLAN (3/6)
- AMENDED - TREE RETENTION AND PROTECTION PLAN (4/6)
- AMENDED - TREE RETENTION AND PROTECTION PLAN (5/6)
- AMENDED - TREE RETENTION AND PROTECTION PLAN (6/6)
- AMENDED - ARBORICULTURAL IMPACT ASSESSMENT AND METHOD STATEMENT
- AMENDED- EXISTING TREE SCHEDULE
- COMMUNITY AND LEISURE (TVBC)
- MRS LIZ TAYLOR(FULL)
- MRS WENDY AMOR
- LANDSCAPE (TVBC)
- HIGHWAYS (HCC)
- TREES (TVBC)
- MR JAY TAYLOR(FULL)
- ANDOVER TOWN COUNCIL
- APPLICATION FORM
- BIODIVERSITY METRIC CALCULATION TOOL
- REQUIREMENTS CHECKLIST
- BIODIVERSITY NET GAIN STATEMENT
- DRAINAGE DOCUMENTATION
- PRELIMINARY ECOLOGICAL APPRAISAL
- PUBLIC ENGAGEMENT 2026 - ANALYSIS REPORT
- LUMINAIRE STRUCTURE (OUTDOOR BOLLARDS)
- LUMINAIRE STRUCTURE (OUTDOOR SUFACE FACADE LUMINAIRES)
- DESIGN PROPOSAL - SPLASHPAD (1/4)
- DESIGN PROPOSAL - SPLASHPAD (2/4)
- DESIGN PROPOSAL - SPLASHPAD (3/4)
- DESIGN PROPOSAL - SPLASHPAD (4/4)
- BIODIVERSITY CHECKLIST
- PLANNING STATEMENT
- SUSTAINABILITY APPRAISAL
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP)
- LANDSCAPING DETAILS
- SITE LOCATION PLAN
- EXISTING BLOCK PLAN
- PROPOSED BLOCK PLAN
- EXISTING SITE PLAN
- PROPOSED SITE PLAN
- PROPOSED FLOOR PLAN
- ROOF PLAN - PROPOSED
- PROPOSED ELEVATIONS/SECTIONS
- PROPOSED PLANT ROOM
- PROPOSED VISUALISATIONS I
- PROPOSED VISUALISATIONS II
- PROPOSED VISUALISATIONS III
- PROPOSED VISUALISATIONS IV
- PROPOSED VISUALISATIONS V
- PROPOSED VISUALISATIONS VI
- PROPOSED VISUALISATIONS VII
- PROPOSED VISUALISATIONS VIII
- EXTRACT ASSESSMENT
- HORIZONTAL ILLUMINANCE (LUX)
- TRANSPORT STATEMENT
- ADDITIONAL - GENERAL ARRANGEMENT
- ADDITIONAL - FEATURE LAYOUT
- ADDITIONAL - SHADE AWNING
- ADDITIONAL - PIPE RUNS
- ADDITIONAL - CONCRETE FALLS
- ADDITIONAL - SUCTION CHAMBER INSTALL
- ADDITIONAL - ATTENUATION TANK INSTALL
- ADDITIONAL - SURFACING LAYOUT
- ADDITIONAL - PLANTROOM BUILDING
- DESIGN AND ACCESS STATEMENT (1/2)
- DESIGN AND ACCESS STATEMENT (2/2)
- LANDSCAPE DESIGN STRATEGY
- LIGHTING IMPACT ASSESSMENT
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Test Valley for determination, against a statutory target of eight weeks. Over the last year Test Valley's median decision took 51 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Test Valley's portal will say. Our guide explains the common types.