Planning application
26/00817/FULLN
Amport Church Of England Primary School The Green Amport Andover Hampshire SP11 8BA
Proposal
Erection of shelter and installation of play equipment with protective matting underneath
As published by the council, reference 26/00817/FULLN
Timeline
Dates from the published record
-
21 Apr 2026
Received by Test Valley
-
17 Jun 2026
Validated
Checked as complete and ready for consideration.
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Test Valley for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00466/FULLN Decided
Field Behind The Old Farm The Green Amport Andover Hampshire SP11 8BA
Change of use of agricultural land to equestrian use, construction of an all weather outdoor riding arena and erection of fence
-
24/01756/TPON Refused
Mussett Cottage The Green Amport Andover Hampshire SP11 8BA
TPO.TVBC.653 - T1 - Beech - Remove 3 diseased limbs and reduce canopy by no more than 3 metres.
-
26/01170/TREEN Granted
Nether Cottage The Green Amport Andover Hampshire SP11 8BA
(T1) Ash - Reduce the house side limbs back to the main stem; (T2) Sycamore - Reduce the house side limbs back to the main stem; (T3) Willow - Remove the Willow limb that has cracked and hanging in the river
-
26/01053/DDCA Decided
Keepers Hill Amport Andover Hampshire SP11 8BE
Dead Pine tree within the Amport and Monxton Conservation Area - Fell stem
-
24/01605/CLPN Decided
Ashbrook Furzedown Lane Amport Andover Hampshire SP11 8BE
Application for lawful development certificate for proposed rebuilding of short run of damaged garden wall to match existing in appearance
-
26/00601/TREEN Granted
Marigold Cottage Monxton Road Amport Andover Hampshire SP11 8AX
T1- Fell Conifer to ground level
Other full applications applications
In Test Valley
-
26/01224/FULLS Decided
4 Rectory Hill West Dean Salisbury Wiltshire SP5 1JL
Replacement porch, two storey side extension, single storey rear extension, replacement garage and construction of vehicular access
-
26/01634/FULLN Awaiting decision
8 Cheavley Close Andover Hampshire SP10 3NH
Single storey rear extension
-
26/01623/FULLS Awaiting decision
85 Upton Crescent Nursling Southampton Hampshire SO16 8AA
Replacement outbuilding for use as home office/games room
-
26/01628/FULLN Awaiting decision
142 Weyhill Road Andover Hampshire SP10 3BG
Two storey and part single storey rear extensions and single storey side extension with replacement flat roof over garage
-
26/01626/FULLS Awaiting decision
Hazeldene Sandy Lane Abbotswood Romsey Hampshire SO51 0PD
Single storey rear, and first floor front extensions, new dormer windows at second floor, and alterations to windows and doors