Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00632/FULLN

Yew Tree Cottage High Street Stockbridge Hampshire SO20 6EU

Decided Test Valley FULL APPLICATION - NORTH

Proposal

Single storey extension to front elevation

As published by the council, reference 26/00632/FULLN

Timeline

Dates from the published record

  1. 25 Mar 2026

    Received by Test Valley

  2. 16 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 29 May 2026

    Decision issued: PERMISSION subject to conditions & notes

  4. 26 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/02998/FULLN Withdrawn

    Yew Tree Cottage High Street Stockbridge Hampshire SO20 6EU

    Single storey extension to front elevation

    17 Dec 2025 0m away Full applications
  • 26/01449/CLEN Awaiting decision

    Trafalgar House High Street Stockbridge Hampshire SO20 6HF

    Certificate of lawful existing use of an existing residential annexe, approved as ancillary accommodation to the main dwellinghouse, for limited and ancillary short term lets when not occupied by family or guests of the main dwelling house, together with continued ancillary residential use and domestic storage and confirmation that this remains within the planning unit of the main dwellinghouse and does not constitute a material change of use

    6 Jul 2026 103m away Lawful development
  • 26/01303/TREEN Awaiting decision

    Brooklands High Street Stockbridge Hampshire SO20 6EU

    G1 - Conifer - Fell

    17 Jun 2026 109m away Trees
  • 26/00055/TREEN Granted

    Land At OS Ref 435896 134970 Trafalgar Way Stockbridge Hampshire

    T1 - Elder - Dismantle to safe level, T2 - Willow - Crown uplift to approx 2m over kiosk

    13 Jan 2026 166m away Trees
  • 26/00161/TREEN Granted

    Seven Gables Winton Hill Stockbridge Hampshire SO20 6HL

    T1 - Sycamore - Re-pollard to previous cuts and cut back overhanging branch over garden, T2- Ash - Re-pollard to previous cuts

    27 Jan 2026 166m away Trees
  • 21/00833/TREEN Granted

    Napier Marsh Court Road Stockbridge Hampshire SO20 6JH

    Fell Ash

    18 Mar 2021 203m away Trees

In Test Valley

  • 26/01224/FULLS Decided

    4 Rectory Hill West Dean Salisbury Wiltshire SP5 1JL

    Replacement porch, two storey side extension, single storey rear extension, replacement garage and construction of vehicular access

    8 Jun 2026 Full applications
  • 26/01634/FULLN Awaiting decision

    8 Cheavley Close Andover Hampshire SP10 3NH

    Single storey rear extension

    28 Jul 2026 Full applications
  • 26/01623/FULLS Awaiting decision

    85 Upton Crescent Nursling Southampton Hampshire SO16 8AA

    Replacement outbuilding for use as home office/games room

    28 Jul 2026 Full applications
  • 26/01628/FULLN Awaiting decision

    142 Weyhill Road Andover Hampshire SP10 3BG

    Two storey and part single storey rear extensions and single storey side extension with replacement flat roof over garage

    28 Jul 2026 Full applications
  • 26/01626/FULLS Awaiting decision

    Hazeldene Sandy Lane Abbotswood Romsey Hampshire SO51 0PD

    Single storey rear, and first floor front extensions, new dormer windows at second floor, and alterations to windows and doors

    28 Jul 2026 Full applications