Planning application
Land At London Road London Road Andover Hampshire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of 5G telecoms H3G 20m street pole and additional equipment cabinets
As published by the council, reference 22/03232/TELN
Application record
- Reference
- 22/03232/TELN
- Type
- TELECOMMUNICATION NOTIFICATION - NORTH
- Status
- Current
- Decision
- Prior Approval Required and Granted
- Received
- 9 Dec 2022
- Validated
- 9 Dec 2022
- Decided
- 20 Jan 2023
- Ward
- ANDOVER ST MARYS
- Parish
- ANDOVER TOWN (ST MARYS)
- Decision by
- Delegated Decision
- Postcode
- SP10 2PR
Timeline
Dates from the published record
-
9 Dec 2022
Received by Test Valley
-
20 Jan 2023
Decision issued: Prior Approval Required and Granted
-
28 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Dot Surveying Limited Agent, a surveying firm registered in Solihull
Active · incorporated 2020 · Solihull
343 applications on PlanIndex · across 114 councils · 47% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Test Valley granted permission on 20 January 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About telecoms applications
Telecoms applications cover masts, antennas and cabinets, usually as prior approval cases where the council considers siting and appearance only. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
30B London Road Andover Hampshire SP10 2PP
Roof alterations including half-hip gable, dormers to front and rear, removal of rear balcony and roof overhang and replacement single storey rear extension
Withdrawn Extension Loft or dormer +1 11 docsSmall domestic -
17 Pearman Drive Andover Hampshire SP10 2SB
92% historically approved · decision due ~11 Nov
Sycamore (A) - Pollard, reduce height to between 7m and 8m, reduce spread to between 5m and 6m, take back branches to 1m - 2m beyond previous cut points creating new knuckles, remove dead/stripped branches
Awaiting decision Trees -
-
11 Pearman Drive Andover Hampshire SP10 2SB
To fell a Horse Chestnut tree at the back, right of the rear garden. Tree is unbalanced/decayed and a danger to nearby property.(TPO.TVBC.378)
Decided Trees 1 doc -
11 Collingwood Walk Andover Hampshire SP10 1PU
Change of use of land to residential and erection of shed and fence
Granted Full applications 15 docsSmall domestic -
27 Pearman Drive Andover Hampshire SP10 2SB
Conversion of garage to family room (relaxation of requirements of condition 11 of TVN.05955/4 requiring the garage to be used for no purpose other than the parking of cars)
Granted Full applications 9 docs
Other telecoms applications
In Test Valley
-
25/02127/TELS Granted
Grass Verge, Land South Of Sixth Romsey Scout Group Romsey Road Lockerley Romsey Hampshire SO51 0LW
Application to determine if prior approval is required for the installation of a telecommunications base station comprising 20 metre high monopole supporting 3 antennas and GPS node, 3 equipment cabinets, and ancillary development thereto
-
25/01121PATC Granted
New Forest National Park
Application under part 16 of the Town & Country planning (General permitted Development) order in respect of proposed telecommunication intrastructure works within the New Forest National Park
-
21/00880/TELN Granted
Land Off Of Abbotts Ann Road Monxton Andover Hampshire SP11 8AS
Application to determine if prior approval is required for Installation of a telecommunications base station