Skip to content
PlanIndex Get alerts
Menu

Planning application

The Granary Barn Bradfield Road Wix Manningtree Essex CO11 2SH

Awaiting decision Tendring 26/01379/LBC Heritage and listed buildings

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Application for Listed Building Consent - Single storey rear extension and alterations for private use.

As published by the council, reference 26/01379/LBC

Application record

Reference
26/01379/LBC
Category
Heritage and listed buildings
Status
Awaiting decision
Received
4 Sep 2026
Validated
10 Sep 2026
Ward
The Oakleys & Wix
Parish
Wix Parish Council
Postcode
CO11 2SH

Site history

Applications at this address on the Tendring register

This site has had 2 applications since 2026.

  • 26/01378/FULHH Awaiting decision

    The Granary Barn Bradfield Road Wix Manningtree Essex CO11 2SH

    Householder Planning Application - Single storey rear extension and alterations for private use

    Submitted 4 Sep 2026

Timeline

Dates from the published record

  1. 4 Sep 2026

    Received by Tendring

  2. 10 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 5 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Tendring took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Tendring for determination, against a statutory target of eight weeks. Over the last year Tendring decided heritage and listed building applications in a median of 65 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Tendring

  • 26/00989/LBC Refused

    Saddlers Cottage 5 St Johns Road Clacton On Sea Essex CO15 4BP

    Application for Listed Building Consent - Replacement of all existing windows with woodgrain-effect uPVC sliding sash windows.

    29 Jun 2026 Heritage and listed buildings
  • 26/00784/LBC Refused

    Land to The rear of 14 to 16 South Street Manningtree Essex CO11 1BB

    Application for Listed Building Consent - Construction of single storey office with pitched roof to front and flat roof to rear. Existing separate office to become part of proposal.

    19 May 2026 Heritage and listed buildings
  • 26/00939/LBC Refused

    Constable Place High Street Mistley Manningtree Essex CO11 1HD

    Application for Listed Building Consent - Works to roof of lean-to extension. Remove existing Velux windows. Installation of solar pv. Installation of dormer.

    19 Jun 2026 Heritage and listed buildings
  • 26/00963/LBC Granted

    Flat 32 Quayside Court The Quay Harwich Essex CO12 3HH

    Application for Listed Building Consent - Temporary propping of truss end near decaying bearing; Repair of leaking box gutter; Repair of part principal truss members; Replace decayed section of wall plate; Replace damaged ceiling and re-instate finishes as existing.

    23 Jun 2026 Heritage and listed buildings
  • 26/00876/LBC Granted

    Thorpe Park Farm 5 Thorpe Park Lane Thorpe Le Soken Clacton On Sea Essex CO16 0HN

    Application for Listed Building Consent - Installation of a stair lift

    8 Jun 2026 Heritage and listed buildings