Thorpe Park Solar Farm Land South of Thorpe-Le-Soken Essex CO16 0HR

Granted Tendring 26/00343/LUEX Certificate Of LU and Devl (existing)

Relates to 25/01235/VOC

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application for Lawful Development Certificate for Existing Use or Development for confirmation of lawful implementation of planning permission 25/01235/VOC by way of material operation (installation of DNO substation unit foundations).

As published by the council, reference 26/00343/LUEX

Application record

Reference
26/00343/LUEX
Type
Certificate Of LU and Devl (existing)
Status
Decided
Decision
Lawful Use Certificate Granted
Received
27 Feb 2026
Validated
27 Feb 2026
Decided
23 Apr 2026
Ward
Thorpe, Beaumont & Great Holland
Parish
Thorpe Le Soken Parish Council
Decision by
Delegated Decision
Postcode
CO16 0HR

Timeline

Dates from the published record

  1. 27 Feb 2026

    Received by Tendring

  2. 23 Apr 2026

    Decision issued: Lawful Use Certificate Granted

  3. 9 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 25/01235/VOC Granted

    Thorpe Park Solar Farm Land South of Thorpe-Le-Soken Tendring Essex

    Application under Section 73 of the Town and Country Planning Act for Variation of pre commencement Conditions 3 (Planning Design and Access Statement), Condition 6 (Arboricultural Method Statement and scheme for protection), Condition 8 (Programme of archaeological investigation), Condition 9 (Construction Methodology and Timetable), Condition 10 (Construction Traffic Management Plan), Condition 11 (Traffic Management Plan), Condition 12 (Vehicular turning facility), Condition 15 (Construction Environmental Management Plan), Condition 16 (Biodiversity Enhancement Strategy), Condition 17 (Landscape and Ecological Management Plan), and Condition 22 (Soil Management Plan) of application 22/02117/FUL to enable/allow limited below-ground foundation works to be carried out to implement the permission by constructing the base for the DNO substation.

    Decided 10 Nov 2025 Amendments

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Tendring granted permission on 23 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Thorpe Park Solar Farm Land South of Thorpe-Le-Soken Tendring Essex CO16 0HR

    21/01860/FUL Submitted 27 Oct 2021 0m away

    Proposed construction and operation of a solar photovoltaic farm and associated infrastructure, including inverters, substations, security cameras, fencing, access tracks and landscaping.

    Refused Full applications 74 docs
  • Thorpe Park Solar Farm Land South of Thorpe-Le-Soken Tendring Essex

    25/01235/VOC Submitted 19 Aug 2025 0m away

    Application under Section 73 of the Town and Country Planning Act for Variation of pre commencement Conditions 3 (Planning Design and Access Statement), Condition 6 (Arboricultural Method Statement and scheme for protection), Condition 8 (Programme of archaeological investigation), Condition 9 (Construction Methodology and Timetable), Condition 10 (Construction Traffic Management Plan), Condition 11 (Traffic Management Plan), Condition 12 (Vehicular turning facility), Condition 15 (Construction Environmental Management Plan), Condition 16 (Biodiversity Enhancement Strategy), Condition 17 (Landscape and Ecological Management Plan), and Condition 22 (Soil Management Plan) of application 22/02117/FUL to enable/allow limited below-ground foundation works to be carried out to implement the permission by constructing the base for the DNO substation.

    Granted Amendments 15 docs

In Tendring

  • 26/01323/VOC Awaiting decision

    Land East of Bromley Road Lawford Essex CO11 2HS

    Application under Section 73 of the Town and Country Planning Act for Variation of Condition 2 (Approved Plans) of application 21/00650/OUT to allow an updated Amber housetype for plots 327 and 328 to include a single storey rear extension.

    24 Aug 2026 Amendments
  • 26/01174/NMA Granted

    Blue Gates Farm Carringtons Road Great Bromley Colchester Essex CO7 7UZ

    Non Material Amendment to 25/01706/FULHH - New window on side elevation, change of window to french doors in the kitchen and two new roof lights.

    29 Jul 2026 Amendments
  • 26/01317/VOC Awaiting decision

    Land adjoining Ipswich Road and Wick Lane Ardleigh Essex CO7 7QL

    Application under Section 73 of the Town and Country Planning Act for Variation of Condition 2 (Approved Plans and Documents) of application 20/00594/FUL to amend the approved building from an L-shape to rectangular footprint, amendments to car parking arrangements, inclusion of feature glazed curtain walling to north-east elevation, inclusion of parapet and low pitched roof, and amendments to cladding colour.

    21 Aug 2026 Amendments
  • 26/01153/NMA Granted

    The Panthers Station Road Thorrington Colchester Essex CO7 8JA

    Non Material Amendment to 25/01751/VOC - Change the facing brick to Limewash Cambridge Buff

    24 Jul 2026 Amendments
  • 26/01102/NMA Refused

    Land East of Bromley Road Lawford Essex CO11 2HS

    Non Material Amendment to 21/00650/OUTs - Single storey rear extensions to plots 327 and 328 following purchasers request for additional living space.

    17 Jul 2026 Amendments