Planning application
Bathside Bay Stour Road Harwich Essex CO12 3HF
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Discharge of conditions 5, (Landscaping scheme) 7, (Details of the design and external appearance) 9, (Scheme showing full details of fences, walls, gates and other means of enclosure) 10, (Drawings showing foul and surface water drainage) 11, (Scheme for the design of the proposed Wetland Area) 35, (Details of measures to mitigate gas migration and accumulation) 40, (Scheme for the translocation of reptiles) 48, (Vehicular access) and 49 (Scheme and layout for hard standing for Lorries and cars) of application 10/00202/FUL.
As published by the council, reference 21/01817/DISCON
Application record
- Reference
- 21/01817/DISCON
- Type
- Discharge of Condition
- Status
- Awaiting decision
- Decision
- Part Disharged (Further work required)
- Received
- 21 Oct 2021
- Validated
- 21 Oct 2021
- Decided
- 28 Mar 2022
- Ward
- Harwich & Kingsway
- Parish
- Harwich Town Council
- Postcode
- CO12 3HF
Site history
Applications at this address on the Tendring register
This site has had 9 applications since 2021: 4 approved, 0 refused.
-
26/01165/VOC Awaiting decision
Bathside Bay Stour Road Harwich Essex CO12 3HF
Application under Section 73 of the Town and Country Planning Act for Variation of Conditions 44 (Phases 2, 3, and 4), Condition 45 (Areas not to be paved or equipped), and Condition 46 (Relating to Conditions 44 and 45) of application 21/01810/VOC to enable new wording for each condition subject of amendments.
-
25/01364/DISCON Granted
Bathside Bay Stour Road Harwich Essex CO12 3HF
Discharge of conditions application for 21/01792/VOC - Condition 25 (Ground Gas Mitigation Strategy).
-
25/01363/DISCON Granted
Bathside Bay Stour Road Harwich Essex CO12 3HF
Discharge of conditions application for 21/01810/VOC - Condition 35 (Ground Gas Mitigation Strategy).
-
21/01816/DISCON Decided
Bathside Bay Stour Road Harwich Essex CO12 3HF
Discharge of Conditions 3 - (Landscaping Scheme) , 6 - (Design and External Appearance of Buildings, Structures and Hardstanding Areas), 8 - (Details of Fences, Walls, Gates and other Enclosures), 9 - (Foul and Surface Water Drainage), 25- (Gas Migration and Accumulation), 28 - (Translocation of reptiles, Invertebrates and Costal Vegetation), 29 - (Vehicular Access from A120), 30 - (Scheme of Provision to be made for Disabled People to Gain Access to Public Areas) 32- (Scheme and Layout of Hard Standing for Vehicles)of application 10/00203/FUL.
-
21/01810/VOC Granted
Bathside Bay Stour Road Harwich Essex CO12 3HF
Variation of conditions 2 (Approved Plans / Documents), 28 (Operational Lighting), 41 (Highways), 42 (Highways), 43 (Highways), 44 (Highways), 52 (Operational Air Quality Controls) and 53 (Operational Traffic Noise Attenuation) of application 10/00202/FUL in respect of the proposed Bathside Bay container terminal, Harwich.
-
21/01792/VOC Granted
Bathside Bay Stour Road Harwich Essex CO12 3HF
Variation of condition 20 of application 10/00203/FUL to not release HPUK from the requirement to secure the prior approval and installation of operational lighting, but to defer submission, approval and installation in respect of these details prior to any operation of the SBH. The application sets out the proposed amended wording for this condition.
-
21/01624/DISCON Decided
Bathside Bay Stour Road Harwich Essex CO12 3HF
Discharge of conditions 10, (Archaeological work) 11, (Construction management plan) 12, (Control of noise and vibration) 14, (Approved system for operating vehicles and plants) 15, (Percussive piling operation) 19, (Scheme of construction lighting) 21, (Construction dust management plan) 23, (Details of a wheel wash facility) 24, (Handling of materials) 26 (Scheme for concrete pouring) and 27 (Scheme for pollution control) of application 10/00203/FUL.
-
21/01625/DISCON Decided
Bathside Bay Stour Road Harwich Essex CO12 3HF
Discharge of conditions 3, (Scheme of phasing substantially) 12, (Archaeological work) 13, (Construction management plan) 14, (Control of noise and vibration) 16, (Reverse warning system) 17, (Percussive piling operation) 25, Scheme of construction lighting) 27, (Details of luminaries) 29, (Construction dust management plan) 30, (Cleaning and maintenance programme) 32, (Wheel wash facility) 33, (Handling of materials) 34, (Ambient dust monitoring strategy) 36, (Flood evacuation plan) 38 (Scheme for concrete pouring and filling works) and 39 (Scheme for pollution control) of application 10/00202/FUL.
Timeline
Dates from the published record
-
21 Oct 2021
Received by Tendring
-
28 Mar 2022
Decision issued: Part Disharged (Further work required)
-
9 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
75 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Tendring has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Bathside Bay Stour Road Harwich Essex CO12 3HF
Discharge of conditions application for 21/01792/VOC - Condition 25 (Ground Gas Mitigation Strategy).
Granted Conditions 8 docs -
Bathside Bay Stour Road Harwich Essex CO12 3HF
Discharge of conditions application for 21/01810/VOC - Condition 35 (Ground Gas Mitigation Strategy).
Granted Conditions 8 docs -
Bathside Bay Stour Road Harwich Essex CO12 3HF
96% historically approved · decision due ~7 Oct
Application under Section 73 of the Town and Country Planning Act for Variation of Conditions 44 (Phases 2, 3, and 4), Condition 45 (Areas not to be paved or equipped), and Condition 46 (Relating to Conditions 44 and 45) of application 21/01810/VOC to enable new wording for each condition subject of amendments.
Awaiting decision Amendments 93 docs -
Trinity House adjacent Old Mercedes Building Stour Road Harwich Essex CO12 3HF
Trees in a Conservation Area Notification - Crown lift to 13no. Holm Oak (Quercus ilex) to provide clearance over the footway and carriageway, and crown reduction back to previous pruning points.
Granted Trees -
9 Talbot Street Harwich Essex CO12 3JQ
Householder Planning Application - single storey rear extension, fenestration changes (including new windows to the side and rear elevations), new recessed front door and re-rendering the external walls.
Granted Full applications Extension Windows or glazing 14 docsSmall domestic -
41 Fernlea Road Harwich Essex CO12 3BW
Proposed single storey side extension.
Granted Full applications Extension 8 docsSmall domestic
Other condition discharge and variation applications
In Tendring
-
26/01537/DISCON Awaiting decision
Land adjacent to Gaylawn Lodge Main Road Frating Essex CO7 7DJ
Discharge of conditions application for 25/01081/FUL - Condition 20 (RAMS), Condition 21 (Biodiversity net gain plan) and Condition 22 (Habitat Management and Monitoring Plan).
-
26/01528/DISCON Awaiting decision
757 St Johns Road Clacton On Sea Essex CO16 8BJ
Discharge of conditions application for 24/00712/DETAIL - Condition 14 (Details of Sheds for Cycle Parking).
-
26/01522/DISCON Awaiting decision
8 Harold Road Frinton On Sea Essex CO13 9BE
Discharge of conditions application for 26/00293/FUL - Condition 10 (Agreement of Materials), Condition 11 (Landscaping Scheme), and Condition 13 (Biodiversity Enhancement Strategy).
-
26/01510/DISCON Awaiting decision
Peake Fruit Ltd Home Farm Lane Ardleigh Colchester Essex CO7 7NA
Discharge of conditions application for 25/01249/FUL - Condition 7 (Construction Management Plan), Condition 17 (Scheme to Minimise the Risk of Offsite Flooding) and Condition 19 (Biodiversity Net Gain Plan).
-
26/01503/COMCON Awaiting decision
Capitol Gardens 45 Manor Lane Dovercourt Harwich Essex CO12 4EA
Request for written confirmation of compliance with all conditions relating to application 19/00249/FUL (approved at appeal: APP/P1560/W/19/3243900).