Skip to content
PlanIndex Get alerts
Menu

Planning application

Lincoln Hill House, 46 Lincoln Hill, Ironbridge, Telford, Shropshire, TF8 7QA

Granted Telford and Wrekin TWC/2026/0300 Full Planning

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement of existing stone retaining wall with retaining gabion baskets (Full Planning application) **AMENDED PLANS RECEIVED**

As published by the council, reference TWC/2026/0300

Application record

Reference
TWC/2026/0300
Type
Full Planning
Status
Decided
Decision
Full Granted
Received
13 Apr 2026
Validated
29 Apr 2026
Decided
10 Jul 2026
Ward
Ironbridge Gorge
Parish
The Gorge
Decision by
Delegated
Postcode
TF8 7QA

Site history

Applications at this address on the Telford and Wrekin register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • TWC/2026/0301 Granted

    Lincoln Hill House, 46 Lincoln Hill, Ironbridge, Telford, Shropshire, TF8 7QA

    Replacement of existing stone retaining wall with retaining gabion baskets (Listed Building Application) **AMENDED PLANS RECEIVED**

    Decided 10 Jul 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 13 Apr 2026

    Received by Telford and Wrekin

  2. 29 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 10 Jul 2026

    Decision issued: Full Granted

  4. 22 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

The Morton Partnership Ltd Agent, registered in Halesworth

Active · incorporated 1992 · Halesworth

19 applications on PlanIndex · across 9 councils · 88% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Telford and Wrekin granted permission on 10 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Lincoln Hill House, 46 Lincoln Hill, Ironbridge, Telford, Shropshire, TF8 7QA

    TWC/2026/0301 Submitted 13 Apr 2026 0m away

    Replacement of existing stone retaining wall with retaining gabion baskets (Listed Building Application) **AMENDED PLANS RECEIVED**

    Granted Heritage and listed buildings 22 docs
  • 56 Church Hill, Ironbridge, Telford, Shropshire, TF8 7QB

    TA/2021/1360 Submitted 20 Sep 2021 109m away

    98% historically approved · decision due ~15 Nov

    Pruning of 3no. apple trees, 2no. plum trees, 2no. cherry trees, 1no. damson, coppicing of 1no. hazel and redcution in height of 2no. sycamore trees

    Awaiting decision Trees
  • 1 Severn Terrace, Ironbridge, Telford, Shropshire, TF8 7AT

    TWC/2023/0151 Submitted 2 Mar 2023 112m away

    Removal of 2no. Prunus SPP tree (T1 & T2) & 1no. Malus SPP tree (T3) & replant with similar species. Reduction of radial branch length by up to 2m & reshape 1no. Malus SPP tree (T4). Crown reduction & reshape by up to 2m to 2no. Damson trees (T5 & T6) & crown reduction by up to 3m to 1no. Bay tree (T7). Removal of 2no. Moribund Cherry trees (G1 & G2) and replant with similar species & reshape by up to 1.5m to 1no. Malus SPP tree (G3)

    Granted Trees 4 docs
  • 1 Severn Terrace, Ironbridge, Telford, Shropshire, TF8 7AT

    TA/2020/0039 Submitted 4 Jan 2020 116m away

    98% historically approved · decision due ~29 Feb

    Tree Works

    Awaiting decision Trees
  • 58 Hodge Bower, Ironbridge, Telford, Shropshire, TF8 7QE

    TA/2021/1187 Submitted 6 Aug 2021 132m away

    92% historically approved · decision due ~1 Oct

    Proposed first floor garage conversion to habitable space and installation of an external staircase

    Awaiting decision Full applications
  • The Old Rectory, 56 Hodge Bower, Ironbridge, Telford, Shropshire, TF8 7QE

    TA/2025/0967 Submitted 22 Jul 2025 132m away

    92% historically approved · decision due ~16 Sep

    Replacement 1no. bay window and 1no. set of door and windows to rear elevation

    Awaiting decision Heritage and listed buildings Windows or glazing

In Telford and Wrekin

  • TWC/2026/0573 Granted

    12A Duke Street, Wellington, Telford, Shropshire, TF1 1BJ

    Replacement of shopfront including the widening of entrance door, replacement of windows and paint to timberwork, replacement of 4no. windows and 1no. door to the rear and installation of 1no. buggy store and 1no. storage unit

    28 Jul 2026 Full applications
  • TWC/2026/0597 Granted

    Ashdale, Isombridge Lane, Longdon On Tern, Telford, Shropshire, TF6 6LH

    Erection of a single storey front and side extension

    7 Aug 2026 Full applications
  • TWC/2026/0535 Granted

    2 Spring Terrace, Rock Road, The Rock, Telford, Shropshire, TF3 5AQ

    Erection of first floor rear extension and rendering of existing single storey side and rear extension ***Amended description and amended plans received***

    2 Jul 2026 Full applications
  • TWC/2026/0530 Granted

    24 Exeter Drive, Wellington, Telford, Shropshire, TF1 3PR

    Demolition of an existing conservatory and erection of a single storey rear extension with associated landscaping

    14 Jul 2026 Full applications
  • TWC/2026/0599 Granted

    16 St Johns Drive, Trench, Telford, Shropshire, TF2 7HS

    Erection of a single storey side and rear extension with wood burning flue and erection of detached outbuilding

    12 Aug 2026 Full applications