Planning application
Coalbrookdale And Ironbridge C Of E Primary School, Dale End, Ironbridge, Telford, Shropshire, TF8 7DS
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of a lift, enclosing corridors at the rear of the school and blocking up of 3no. windows ****AMENDED PLANS RECEIVED**** ****AMENDED DESCRIPTION****
As published by the council, reference TWC/2021/0427
Application record
- Reference
- TWC/2021/0427
- Type
- Full Planning
- Status
- Decided
- Decision
- Granted As published: Full Granted
- Received
- 13 Apr 2021
- Validated
- 5 May 2021
- Decided
- 8 Jul 2021
- Ward
- Ironbridge Gorge
- Parish
- The Gorge
- Decision by
- Delegated
- Postcode
- TF8 7DS
Site history
Applications at this address on the Telford and Wrekin register
This site has had 3 applications since 2021: 1 approved, 0 refused.
-
TA/2025/0722 Awaiting decision
Coalbrookdale And Ironbridge C Of E Primary School, Dale End, Ironbridge, Telford, Shropshire, TF8 7DS
Tree Works
-
TA/2025/0198 Awaiting decision
Coalbrookdale And Ironbridge C Of E Primary School, Dale End, Ironbridge, Telford, Shropshire, TF8 7DS
Felling of 1no. Lime tree (Tree 1), lifting of low branches to 1no. Holly tree (Tree 3), 1no. Maple tree (Tree 6), 1no. Hawthorn tree (Tree 9) and 1no. Beech tree (Tree 13), removal of epicormic growth to 1no. Lime tree (Tree 11), removal of epicormic growth and lifting of low branches to 2no. Lime tree (Tree 12 and Tree 14), removal of epicormic growth and removal of low branches to 1no. Lime tree (Tree 16), removal of low branches to 1no, Lime tree (Tree 18), branches cut back to 1no. Fruit tree (Tree 23) and removal to as low as possible to 1no. group of 2no. self set Sweet Chestnut trees (Tree 25)
Timeline
Dates from the published record
-
13 Apr 2021
Received by Telford and Wrekin
-
5 May 2021
Validated
Checked as complete and ready for consideration.
-
8 Jul 2021
Decision issued: Full Granted
-
23 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
PR Associates Ltd Agent, registered in Pershore
Active · incorporated 2010 · Pershore
15 applications on PlanIndex · across 4 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Telford and Wrekin granted permission on 8 July 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Homestead, Dale End, Ironbridge, Telford, Shropshire, TF8 7DS
Replacement of 1no. window, 1no. door, 2no. garage doors and installation 2no. roof lights
Granted Full applications Loft or dormer Windows or glazing 15 docs -
Coalbrookdale And Ironbridge C Of E Primary School, Dale End, Ironbridge, Telford, Shropshire, TF8 7DS
99% historically approved · decision due ~24 Jul
Tree Works
Awaiting decision Trees -
Brooke Evans Ironbridge, Dale End, Ironbridge, Telford, Shropshire, TF8 7DS
91% historically approved · decision due ~5 Nov
Variation of condition 10 of application TWC/2018/0912 (Change of use from garage (Use Class Sui Generis) to a hair salon (Use Class A1) *****AMENDED OWNERSHIP CERTIFICATE SUBMITTED*****) to extend operating hours
Awaiting decision Full applications -
Brooke Evans Ironbridge, Dale End, Ironbridge, Telford, Shropshire, TF8 7DS
91% historically approved · decision due ~5 Nov
Creation of vehicle access
Awaiting decision Full applications -
3 Foundry Mews, Dale End, Ironbridge, Telford, Shropshire, TF8 7AX
Installation of 1no. new ground floor window on rear elevation
Granted Full applications Windows or glazing 10 docs -
Innwood, Dale End, Ironbridge, Telford, Shropshire, TF8 7DT
Replacement of 16no. windows and 1no. door
Granted Full applications Windows or glazing 12 docs
Other full applications
In Telford and Wrekin
-
TWC/2026/0604 Granted
50 Hordley Road, Wellington, Telford, Shropshire, TF1 3NR
Erection of a pitched entrance porch to the front elevation and construction of a lean-to roof over the existing flat concrete garage roof (Retrospective)
-
TWC/2026/0595 Withdrawn
36 Coalford, Jackfield, Telford, Shropshire, TF8 7NA
Structural repair and conversion of an existing outbuilding/garage to provide a home office
-
TWC/2026/0590 Granted
34 Wellington Road, Coalbrookdale, Telford, Shropshire, TF8 7DU
Erection of a summer house following demolition of the existing summer house (Full Planning Application)
-
TWC/2026/0586 Refused
39 Harvey Crescent, Arleston, Telford, Shropshire, TF1 2NZ
Variation of condition 2 (materials) and condition 3 (deposited plans) of TWC/2023/0834 (Erection of single storey side extension and front porch) to allow amendments to proposed elevations including canopy design
-
TWC/2026/0584 Granted
147 Regent Street, Wellington, Telford, Shropshire, TF1 1SJ
Erection of a single storey rear extension and creation of a ramped access to front elevation