Skip to content
PlanIndex Get alerts
Menu

Planning application

Langdon Hospital Dawlish Devon EX7 0NR

Awaiting decision Teignbridge 26/01313/DEM Demolition Notification

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Prior Approval for demolition of buildings Tamar, Exe, Torridge and Teign

As published by the council, reference 26/01313/DEM

Application record

Reference
26/01313/DEM
Type
Demolition Notification
Status
Pending Consideration
Received
14 Aug 2026
Validated
24 Aug 2026
Ward
Dawlish North East
Parish
DAWLISH
Postcode
EX7 0NR

Timeline

Dates from the published record

  1. 14 Aug 2026

    Received by Teignbridge

  2. 24 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 19 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Teignbridge took a median of 51 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Exeter

22 applications on PlanIndex · across 5 councils · 82% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Teignbridge for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About other applications

How this application type works

This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.

More on other applications in our guide

Nearby applications

Within 500 metres

  • Devon Partnership NHS Trust Langdon Hospital Dawlish EX7 0NR

    26/00532/TPO Submitted 25 Mar 2026 370m away

    Fell one sycamore (T34). Crownlift trees within G11 adjacent to proposed footpath to achieve 3m ground clearance. Works to G11 and T34 are required to install a footpath as part of a consented planning application. Remove three branches overhanging road on poplar (T13), as shown in attached photo. Works are required for to reduce leverage on branch unions to allow the safe retention of the tree. Crownlift trees T23, G24, and T25 to achieve 5m ground clearance to allow the installation of a retaining wall.

    Granted Trees 9 docs
  • Various Bus Shelters Around Dawlish EX7 0NR

    26/01392/CONSLTDCC Submitted 2 Sep 2026 370m away

    84% historically approved · decision due ~28 Oct

    Notification of intention to instal a group of bus shelters in the Dawlish area, two of which fall within the conservation area. Can put solar interior lighting inside but would not illuminate any potential ad panel to leave it as a daytime poster display.

    Awaiting decision Outline 1 doc
  • Land To The Rear Of 46 Trumpeter Place Dawlish EX7 0RN

    26/01342/TPO Submitted 21 Aug 2026 457m away

    94% historically approved · decision due ~19 Oct

    T18, G19, T20 Four Monterrey cypress - crownlift to achieve a 5m ground clearance. Remove one limb with lateral split (photo attached).

    Awaiting decision Trees 4 docs

In Teignbridge

  • 26/01255/AGR Decided

    Land At Ngr 283389 65745 Edgelands Lane Ipplepen Devon

    Agricultural building

    3 Aug 2026 Other
  • 26/01282/AGR Awaiting decision

    Darnaford Cottages Darnaford Lane Longdown Exeter EX6 7BB

    Removal of approximately 3000 cubic metres (8m x 19m x 19 m) of stone for the purpose of upgrading existing forest tracks

    10 Aug 2026 Other
  • 26/01243/AGR Awaiting decision

    Land At Long Lane Haccombe

    New agricultural building

    31 Jul 2026 Other
  • 26/01101/AGR Decided

    Mount Boon Farm Perridge Lane Longdown Devon EX6 7RT

    Agricultural building for the storage of machinery

    8 Jul 2026 Other
  • 26/01061/AGR Decided

    Hill Farm Barn Hill Lane Whitestone Devon EX4 2JN

    Agricultural access track

    30 Jun 2026 Other