Skip to content
PlanIndex Get alerts
Menu

Planning application

98 Ringmore Road Shaldon Devon TQ14 0ET

Awaiting decision Teignbridge 26/01240/CAN Conservation Area Notifications

Works: Trees

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

G1: Rear Garden Area RHS: Bank Area: 2x Dead Elms: Sectional fell to ground level. LHS: 1x Silver Birch: Prune 2x Limbs on LHS back to main stem. Lowest branch is approximately 2 -3in and is growing straight into hedge and neighbours garden a low level. 2nd branch is over extended and growing into driveway area restricting its use.

As published by the council, reference 26/01240/CAN

Application record

Reference
26/01240/CAN
Type
Conservation Area Notifications
Status
Pending Consideration
Received
30 Jul 2026
Validated
31 Jul 2026
Ward
Shaldon And Stokeinteignhead
Parish
SHALDON
Postcode
TQ14 0ET

Timeline

Dates from the published record

  1. 30 Jul 2026

    Received by Teignbridge

  2. 31 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 13 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 25 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Teignbridge took a median of 52 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Teignbridge for determination, against a statutory target of eight weeks. Over the last year Teignbridge decided heritage and listed building applications in a median of 44 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Teignbridge

  • 26/01524/LBC Awaiting decision

    1 Southey Lane Kingskerswell Devon TQ12 5JF

    Engineering works to stone retaining wall and replacement of asbestos cement roof tiles with natural slate tiles

    Received 28 Sep, published by the council 5 Oct 2026 Heritage and listed buildings
  • 26/01511/LBC Awaiting decision

    7 Barton Terrace Dawlish Devon EX7 9QH

    Cap off two chimney stacks below roof level and slate over

    Received 25 Sep, published by the council 5 Oct 2026 Heritage and listed buildings
  • 26/01512/CAN Awaiting decision

    9 Brook Close Holcombe Devon EX7 0JS

    T1 Ash - Pollard tree to approximately 8m from ground level.

    Received 25 Sep, published by the council 30 Sep 2026 Heritage and listed buildings
  • 26/01509/CAN Awaiting decision

    St Michaels Church Of England Primary School Church Street Kingsteignton Devon TQ12 3BQ

    Tree 1 - Pittosporum - Sectional Fell / Dismantle Tree 2 - Ash - Sectional Fell / Dismantle

    Received 25 Sep, published by the council 30 Sep 2026 Heritage and listed buildings
  • 26/01502/CAN Awaiting decision

    The Manor House Old Town Street Dawlish Devon EX7 9AP

    T1 - Norway spruce - Fell to ground level by sectional dismantling T2 - Conifer - Fell to ground level by sectional dismantling

    Received 24 Sep, published by the council 28 Sep 2026 Heritage and listed buildings