Planning application
26/00186/FUL
Brunel House Orchard Terrace Bovey Tracey Devon TQ13 9AH
Proposal
Replacement of the windows and doors
As published by the council, reference 26/00186/FUL
Timeline
Dates from the published record
-
4 Feb 2026
Received by Teignbridge
-
2 Mar 2026
Validated
Checked as complete and ready for consideration.
-
15 Apr 2026
Decision issued: PERMISSION GRANTED
-
26 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00951/LBC Awaiting decision
Yew Tree House 66 Fore Street Bovey Tracey Devon TQ13 9AE
Removal of internal stud wall
-
26/00870/HOU Awaiting decision
13 Town Hall Place Bovey Tracey Devon TQ13 9AA
Erection of a single storey timber garden room
-
26/00650/ADV Granted
Cromwell Arms Hotel Fore Street Bovey Tracey Devon TQ13 9AE
2 externally illuminated fascia signs, 4 non illuminated amenity/fascia signs, 1 non illuminated directional sign and 1 internally illuminated menu case
-
25/01529/CAN Granted
Bovey Tracey Baptist Church Hind Street Bovey Tracey TQ13 9HT
Field Maple tree - reduce in height to approx 4.5 and 4m in width
-
25/01737/TPO Awaiting decision
1 Badgers Way Bovey Tracey Devon TQ13 9QY
T1 Oak - Crown lift canopy of Oak tree overhanging pavement and road to a height of 5.5 metres from ground level to give highway clearance. This to be done by the removal of tertiary limbs only.
-
26/00489/FUL Granted
Willowray Mary Street Bovey Tracey Devon TQ13 9HQ
Construction of an annexe
Other full applications applications
In Teignbridge
-
26/01210/FUL Awaiting decision
Cross Park Farm Heath Cross Whitestone Devon EX4 2HN
Part retention for the erection of 3 light industrial buildings and associated infrastructure
-
26/00715/FUL Refused
Oakcliff Park Mount Pleasant Road Dawlish Warren Devon EX7 0LX
Proposed solar boundary fence (approx. 13 kW renewable energy installation)
-
26/01176/FUL Awaiting decision
Marine Hotel And Tavern 2 Marine Parade Dawlish Devon EX7 9DJ
Retention of air source heat pump and two condensing units to flat roof
-
26/01168/FUL Awaiting decision
Red Lion Inn Tedburn St Mary Devon EX6 6EQ
Extension and alterations to existing public house and associated works
-
26/01133/FUL Awaiting decision
Bradley Manor Weir Totnes Road Newton Abbot Devon TQ12 6BN
Removal of the existing weir including site grading where the weir was and bank protection