Skip to content
PlanIndex Get alerts
Menu

Planning application

25/02006/FUL

Land Off Ide Village Road Ide Devon EX2 9SW

Awaiting decision Teignbridge Full Planning Application

Proposal

Change of use of agricultural land to vehicle storage

As published by the council, reference 25/02006/FUL

Timeline

Dates from the published record

  1. 3 Dec 2025

    Received by Teignbridge

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Teignbridge for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00879/CLDE Awaiting decision

    The Bungalow Rollsbridge Farm Ide Devon EX2 9SU

    Certificate of Lawfulness for non-compliance with agricultural tie

    27 May 2026 144m away Lawful development
  • 26/0221/CAT Granted

    Bindle Lodge Perridge Close Exeter EX2 9PX

    T1 - to re-pollard the paper birch back to where it has been done previously. T2- to reduce the left-hand side of the oak tree by approximately 2.5 m and then prune the top left to round into shape, which will remove it from the Openreach cables preventing further damage.

    16 Feb 2026 212m away Trees
  • 26/0779/TPO Granted

    5 And 6 Eagles Nest Exonia Park Exeter EX2 9PZ

    G1 Group of trees along side of 6 Eagles nest. Remove new growths from previous crown lifting over building. T1 Sycamore opposite No 5 Eagles nest. Cut back lowest branch towards property by approx 2m.

    1 Jun 2026 432m away Trees
  • 25/1800/CAT Withdrawn

    Ide View Perridge Close Exeter EX2 9PX

    Fell T6 Aspen to combat subsidence damage

    18 Dec 2025 446m away Trees

In Teignbridge

  • 26/01210/FUL Awaiting decision

    Cross Park Farm Heath Cross Whitestone Devon EX4 2HN

    Part retention for the erection of 3 light industrial buildings and associated infrastructure

    27 Jul 2026 Full applications
  • 26/00715/FUL Refused

    Oakcliff Park Mount Pleasant Road Dawlish Warren Devon EX7 0LX

    Proposed solar boundary fence (approx. 13 kW renewable energy installation)

    24 Apr 2026 Full applications
  • 26/01176/FUL Awaiting decision

    Marine Hotel And Tavern 2 Marine Parade Dawlish Devon EX7 9DJ

    Retention of air source heat pump and two condensing units to flat roof

    21 Jul 2026 Full applications
  • 26/01168/FUL Awaiting decision

    Red Lion Inn Tedburn St Mary Devon EX6 6EQ

    Extension and alterations to existing public house and associated works

    20 Jul 2026 Full applications
  • 26/01133/FUL Awaiting decision

    Bradley Manor Weir Totnes Road Newton Abbot Devon TQ12 6BN

    Removal of the existing weir including site grading where the weir was and bank protection

    16 Jul 2026 Full applications