Planning application

25/01576/FUL

The Manor Main Road Exminster Devon EX6 8AP

Granted Teignbridge Full Planning Application

Proposal

Installation of ground mount photovoltaic array and provision of EV charging point to car park

As published by the council, reference 25/01576/FUL

Timeline

Dates from the published record

  1. 22 Sep 2025

    Received by Teignbridge

  2. 29 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 20 Nov 2025

    Decision issued: PERMISSION GRANTED

  4. 26 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/01576/COND1 Awaiting decision

    The Manor Main Road Exminster EX6 8AP

    Discharge of Biodiversity Gain Plan (Informative) on planning permission 25/01576/FUL - Installation of ground mount photovoltaic array and provision of EV charging point to car park

    1 Jul 2026 0m away Conditions
  • 26/00518/TPO Refused

    3 Limes Court Main Road Exminster Devon EX6 8HU

    T1 Lime - Pollard by reducing limbs back by 3-4m T2 Sycamore - Reduce by 2-3m where applicable to rebalance. Crown lift to 5.2m over the car parks.

    23 Mar 2026 66m away Trees
  • 25/01772/FUL Awaiting decision

    The Dental Surgery Seaton House Main Road Exminster Devon EX6 8DB

    Change of use from Class E to Sui Generis (hot food takeaway)

    28 Oct 2025 112m away Full applications
  • 26/00899/LBC Awaiting decision

    St Martins Church Church Stile Exminster Devon EX6 8DF

    Secure a section of the remaining wall using wall anchors and to rebuild the collapsed section

    1 Jun 2026 134m away Heritage and listed buildings
  • 26/00100/HOU Awaiting decision

    2 Milbury Close Exminster Devon EX6 8AF

    Single storey extension and alterations

    21 Jan 2026 226m away Householder
  • 25/00203/COND1 Awaiting decision

    Stowey Arms Exminster EX6 8AT

    Discharge of condition 2 (noise mitigation) on planning permission 25/00203/FUL - Retention of gazebo within garden area and fire exit door to the rear

    22 Jul 2026 247m away Conditions

In Teignbridge

  • 26/01210/FUL Awaiting decision

    Cross Park Farm Heath Cross Whitestone Devon EX4 2HN

    Part retention for the erection of 3 light industrial buildings and associated infrastructure

    27 Jul 2026 Full applications
  • 26/00715/FUL Refused

    Oakcliff Park Mount Pleasant Road Dawlish Warren Devon EX7 0LX

    Proposed solar boundary fence (approx. 13 kW renewable energy installation)

    24 Apr 2026 Full applications
  • 26/01176/FUL Awaiting decision

    Marine Hotel And Tavern 2 Marine Parade Dawlish Devon EX7 9DJ

    Retention of air source heat pump and two condensing units to flat roof

    21 Jul 2026 Full applications
  • 26/01168/FUL Awaiting decision

    Red Lion Inn Tedburn St Mary Devon EX6 6EQ

    Extension and alterations to existing public house and associated works

    20 Jul 2026 Full applications
  • 26/01133/FUL Awaiting decision

    Bradley Manor Weir Totnes Road Newton Abbot Devon TQ12 6BN

    Removal of the existing weir including site grading where the weir was and bank protection

    16 Jul 2026 Full applications