Planning application
25/00724/SO
Riverside Bishopsteignton Road Teignmouth TQ14 9PH
Proposal
Screening Opinion on Demolition of existing buildings and structures and redevelopment of the site to include employment and community floorspace (Use Classes E(g)/B2/B8/F2), retention and reconfiguration of existing open storage (B8), residential dwellings (Use Class C3) and beach huts holiday accommodation (sui generis use), car parking, river wall, hard and soft landscaping and other associated works
As published by the council, reference 25/00724/SO
Timeline
Dates from the published record
-
14 Aug 2025
Received by Teignbridge
-
21 Aug 2025
Decision issued: Screening - EIA Not Required
-
26 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
26/00487/CLDP Granted
Petrol Station Wm Morrison Supermarkets Plc Newfoundland Road Teignmouth Devon TQ14 9AE
Certificate of Lawfulness for proposed 24 hour opening
-
21/00757/COND3 Decided
The Sea House Bishopsteignton Road Teignmouth TQ14 9AD
Discharge of Conditions 9 (Stone and Mortar Specification), 10 (Sedum Roof Planting Specification) and 11 (Drainage Strategy) on the original application 21/00757/FUL - Demolition of garage and construction of new dwelling
-
21/00757/AMD3 Refused
The Sea House Bishopsteignton Road Teignmouth TQ14 9AD
Non-Material Amendment (revision of drainage strategy incl replacing sedum roof with a single ply membrane and addition of solar panels) to planning permission 21/00757/FUL - Demolition of garage and construction of new dwelling
-
21/00757/AMD2 Granted
The Sea House Bishopsteignton Road Teignmouth TQ14 9AD
Non-Material Amendment (Alterations to first floor window locations; increase in size of rooflights; removal of glazed sidelight and removal of bin store doors) to planning permission 21/00757/FUL - Demolition of garage and construction of new dwelling
-
26/00739/HOU Refused
17 Inverteign Drive Teignmouth Devon TQ14 9AF
Proposed dormer to principal elevation
-
26/01108/TPOE Awaiting decision
Land At Ngr 292658 73346 Off Kingsway Kingsway Teignmouth
Exemption on TPO trees for Crane access - Emergency Crown lift trees for Crane access, Teignmouth - bring the canopy up to around 5m above the carriageway to allow a crane to pass safely beneath the crowns
Other outline applications
In Teignbridge
-
26/01073/OUT Awaiting decision
Crazy Acres Woodland Ashburton Devon TQ13 7LL
Outline planning application for an agricultural managers dwelling (all matters reserved)
-
26/00556/SO Decided
Land At Langford Bridge Kingskerswell Road Newton Abbot Devon
Request for a screening opinion for a new link road
-
26/00711/PIP Refused
Connybear Farm Shop St Marychurch Road Newton Abbot TQ12 4SE
Permission in Principle for up to 9 dwellings
-
26/00747/CONSLT Granted
West Wheatley Farm Westwood Lane Longdown EX6 7RX
Full planning application for the construction of a new waste processing building, together with the formation of skip storage and stockpiling areas, the installation of sustainable drainage (SuDS) features, landscaping, hardstanding and associated infrastructure works
-
26/00747/DCC Granted
West Wheatley Farm Westwood Lane Longdown EX6 7RX
Full planning application for the construction of a new waste processing building, together with the formation of skip storage and stockpiling areas, the installation of sustainable drainage (SuDS) features, landscaping, hardstanding and associated infrastructure works