Skip to content
PlanIndex Get alerts
Menu

Planning application

Manor Cottage Coffinswell Devon TQ12 4SW

Granted Teignbridge 24/00640/HOU Householder applications

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Garden room extension and replacement windows

As published by the council, reference 24/00640/HOU

Application record

Reference
24/00640/HOU
Type
Householder applications
Status
Approved
Decision
Granted As published: PERMISSION GRANTED
Received
16 Apr 2024
Validated
16 Apr 2024
Decided
7 Jun 2024
Ward
Kerswell-with-Combe
Parish
COFFINSWELL
Decision by
Delegated Decision
Postcode
TQ12 4SW

Site history

Applications at this address on the Teignbridge register

This site has had 2 applications since 2024: 2 approved, 0 refused.

  • 24/00641/LBC Granted

    Manor Cottage Coffinswell Devon TQ12 4SW

    Garden room extension and replacement windows

    Decided 7 Jun 2024 Heritage and listed buildings

Timeline

Dates from the published record

  1. 16 Apr 2024

    Received by Teignbridge

  2. 7 Jun 2024

    Decision issued: PERMISSION GRANTED

  3. 24 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Charles Blake Associates Agent, registered in Newton Abbot

Active · incorporated 2005 · Newton Abbot

61 applications on PlanIndex · across 4 councils · 90% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Teignbridge granted permission on 7 June 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Teignbridge

  • 26/01545/HOU Awaiting decision

    Cider Barn Whitestone Devon EX4 2JJ

    Single storey rear extension creating additonal living space

    Received 1 Oct, published by the council 5 Oct 2026 Householder
  • 26/01549/HOU Awaiting decision

    1 Elm Grove Teignmouth Devon TQ14 8SA

    Demolition of existing conservatory and construction of single storey rear/side extension with pitched gabled roofs, formation of a rear terrace with 1800mm high obscure glazed privacy screens to both side elevations, improved stepped garden access, fenestration and material upgrades and associated surface water drainage and biodiversity enhancements

    Received 1 Oct, published by the council 5 Oct 2026 Householder
  • 26/01543/HOU Awaiting decision

    29 Weavers Way Kingskerswell Devon TQ12 5HY

    Single storey side and rear extension and loft conversion including raising of roof and rear dormer

    Received 30 Sep, published by the council 5 Oct 2026 Householder
  • 26/01523/HOU Awaiting decision

    1 Southey Lane Kingskerswell Devon TQ12 5JF

    Engineering works to stone retaining wall and replacement of asbestos cement roof tiles with natural slate tiles

    Received 28 Sep, published by the council 5 Oct 2026 Householder
  • 26/01521/HOU Awaiting decision

    1 Winterbourne Road Teignmouth Devon TQ14 8JT

    Replacement of an existing single storey conservatory and flat roofed structure with a single storey living room extension, alongside external alterations including altered fenestration, updated render and timber cladding finishes, insertion of two second-floor sun tunnels and associated internal reorganisation across ground, first, and second floor levels

    Received 28 Sep, published by the council 30 Sep 2026 Householder