Planning application
Samri, Effingham Road, Burstow, Horley, Surrey, RH6 9RP
Works: New dwelling Extension Several homes
Read from the description, not a valuation. How we read the register
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Change of use of a single dwellinghouse into 4no flats, as well as the addition of a two storey rear extension.
As published by the council, reference 2025/1189
Application record
- Reference
- 2025/1189
- Type
- Full planning
- Status
- Decision Determined
- Decision
- Refused
- Received
- 5 Nov 2025
- Validated
- 5 Nov 2025
- Decided
- 15 Dec 2025
- Ward
- Burstow, Horne and Outwood;Burstow, Horne and Outwood
- Parish
- Burstow;Burstow
- Postcode
- RH6 9RP
Timeline
Dates from the published record
-
5 Nov 2025
Received by Tandridge
-
15 Dec 2025
Decision issued: Refused
-
11 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Samri, Effingham Road, Burstow, Horley, Surrey, RH6 9RP
Erection of single storey side extension. (Certificate of Lawfulness for Proposed Use or Development)
Refused Lawful development Extension 9 docsSmall domestic -
Hawthorn Cottage, Effingham Road, Burstow, Horley, Surrey, RH6 9RP
Erection of a two-storey side extension
Granted Householder Extension 6 docsDomestic -
Edenburn, Effingham Road, Burstow, Horley, Surrey, RH6 9RP
Putting in a mud mound 2 meters high with grass and trees on top to protect our boundary.
Decided Lawful development Trees -
Land North Of Effingam Road, Horley, RH6 9RP
Details pursuant to conditions 9 (Landscaping ) 11 (Electric Vehicle Charging), 12 ( Communal Amenity and Play Area) , 13 (Surface Water Drainage Scheme) , 15 ( Biodiversity Net Gain Plan ) and 19 ( Foul Drainage Assessment and Scheme) of planning permission 2022/299 dated 29.01.2025 ( The change of use of land to a gypsy and traveller caravan site and erection of six day room chalets)
Split decision Conditions -
Silver Birches, Effingham Road, Burstow, Horley, Surrey, RH6 9RP
Variation of Condition 2 (Approved Plans) of ref: 2024/1219 dated 02/04/2025 (Demolition of existing barn, stables and shed and erection of 5 bedroom dwelling and associated works). Variation of plans to allow for minor alterations to the proposed dwelling
Granted Amendments DemolitionSmall domestic -
Arden Cottage, Effingham Road, Burstow, Horley, Surrey, RH6 9RP
Erection of first floor side extension.
Granted Householder Extension 6 docsDomestic
Other full applications applications
In Tandridge
-
2025/1471 Refused
Brookfield, Westerham Road, Limpsfield, Oxted, Surrey, RH8 0EE
Erection of 6x dwellings with parking, access and landscaping as phased development. Phase 1: Infrastructure and roads. Phase 2: Erection of dwellings.
-
2026/1034 Decided
24 Chaldon Road, Caterham, Surrey, CR3 5PE
Replacement of existing timber-framed shopfront with a new powder-coated aluminium shopfront finished in RAL Black Matt, including replacement glazing and entrance door
-
2026/1027 Decided
Stock Cottage, Bones Lane, Newchapel, Lingfield, Surrey, RH7 6HR
Change of use from residential to a children's day nursery with creation of a new internal access track
-
2026/313 Granted
Evergreen, Kings Cross Lane, South Nutfield, Redhill, Surrey, RH1 5NS
Demolition of existing dwelling and garage, erection of new dwelling and associated external works.
-
2026/141 Refused
Standitch Farm, Tilburstow Hill Road, Godstone, Surrey, RH9 8LY
Conversion of stable block to form 1no. 2-bed dwelling and the conversion and extension of the dairy building to form 1no. 3-bed dwelling following demolition of outbuilding. (Amended site area)