Skip to content
PlanIndex Get alerts
Menu

Planning application

Existing Offices At 141, 145, 147, Station Road East, Oxted Rh8 0qe,,

Granted Tandridge 2020/793 Full planning

Relates to 2019/1657/NC

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

External alterations to the building including associated works following the approval of application 2019/1657/NC.

As published by the council, reference 2020/793

Application record

Reference
2020/793
Type
Full planning
Status
Decision Determined
Decision
Granted
Received
30 Apr 2020
Validated
13 May 2021
Decided
9 Aug 2021
Ward
Oxted North and Tandridge
Parish
Oxted
Postcode
RH8 0QE

Site history

Applications at this address on the Tandridge register

This site has had 2 applications since 2019: 2 approved, 0 refused.

  • 2019/1657/NC Granted

    Existing Offices At 141, 145, 147, Station Road East, Oxted Rh8 0qe,,

    Change of use from Use Class B1(a) to Use Class C3 for use as 9 flats (Prior Approval)

    Decided 6 Nov 2019 Prior approval

Timeline

Dates from the published record

  1. 30 Apr 2020

    Received by Tandridge

  2. 13 May 2021

    Validated

    Checked as complete and ready for consideration.

  3. 9 Aug 2021

    Decision issued: Granted

  4. 2 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 2019/1657/NC Granted

    Existing Offices At 141, 145, 147, Station Road East, Oxted Rh8 0qe,,

    Change of use from Use Class B1(a) to Use Class C3 for use as 9 flats (Prior Approval)

    Decided 6 Nov 2019 Prior approval

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Tandridge granted permission on 9 August 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Station Road East, Oxted, RH8 0QE

    2023/180/T Submitted 13 Feb 2023 50 yards away

    Proposed 5G telecoms installation: 15m street pole associated ancillary cabinets

    Refused Prior approval 30 docs
  • 141-143, Station Road East, Oxted, RH8 0QE

    2021/923/NC Submitted 14 May 2021 50 yards away

    Conversion of existing first floor offices to provide 5 no. flats. (Prior approval for Change of Use of a building from Office Use (Class B1 (a)) to a Dwellinghouse (C3)).

    Granted Prior approval New dwelling 9 docs
    Several homes
  • 135 Station Road East, Oxted, Surrey, RH8 0QE

    2021/1053 Submitted 4 Jun 2021 50 yards away

    Installation of extraction / filtration / noise attenuation equipment, replacement of shop front and doors with stacker doors and installation of retractable awning. Display of non-illuminated fascia sign above main entrance.

    Granted Advertising Windows or glazing 15 docs
  • Existing Offices At 141, 145, 147, Station Road East, Oxted Rh8 0qe,,

    2019/1657/NC Submitted 12 Sep 2019 50 yards away

    Change of use from Use Class B1(a) to Use Class C3 for use as 9 flats (Prior Approval)

    Granted Prior approval New dwelling 7 docs
    Several homes
  • Waitrose, 159 Station Road East, Oxted, Surrey, RH8 0QE

    2025/976 Submitted 9 Oct 2025 50 yards away

    Refurbishment of existing Waitrose foodstore, including: new carpark whitelining with minor changes; clean and repair of existing building; removal of existing roof level plant; extension to plant enclosure in rear carpark.

    Granted Full applications Extension
  • 149 Station Road East, Oxted, Surrey, RH8 0QE

    2026/1002 Submitted 18 Sep 2026 50 yards away

    86% historically approved · decision due ~13 Nov

    Erection of 1 fascia sign 1 projecting sign

    Awaiting decision Advertising

In Tandridge

  • 2026/1228 Awaiting decision

    Dormer Cottage, Woodcock Hill, Felbridge, East Grinstead, Surrey, RH19 2RD

    Erection of a dwelling with associated hard and soft landscaping and ecological enhancements

    Received 6 Oct, published by the council 7 Oct 2026 Full applications
  • 2026/421 Refused

    Land Lying To The South Of The Moor House, Moor Lane, , Marsh Green, TN8 5QX

    Conversion of existing stables to create 3 no. bedroom dwelling and associated works.

    Received 19 Jun, published by the council 30 Jul 2026 Full applications
  • 2026/976 Granted

    William Buckwell Memorial Almshouses, 58 Godstone Road, Lingfield, Surrey, RH7 6BT

    Introduction of a vehicular access, drive and parking area

    Received 6 Aug, published by the council 22 Aug 2026 Full applications
  • 2026/135 Granted

    Jesmor Farm, St Piers Lane, Lingfield, Surrey, RH7 6PN

    Change of use of field from paddock and grazing land to be used as secure dog walking field with grazing (sui generis use class) with associated vehicular access and parking provision, erection of fencing and gates up to 1.8m in height, erection of mobile shelter and associated landscaping

    Received 24 Mar, published by the council 30 Jul 2026 Full applications
  • 2025/534 Granted

    Blockfield Farm, Hollow Lane, East Grinstead, Surrey, RH19 3PT

    Erection of equestrian manège and associated works

    Received 21 Jul, published by the council 30 Jul 2026 Full applications