Skip to content
PlanIndex Get alerts
Menu

Planning application

Thornbury Court, Salmons Lane, Whyteleafe, Surrey, CR3 0AP

Granted Tandridge 2020/1230 Full planning

Works: Extension Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of bay window extension at basement level to east elevation in association with land excavation, external retaining wall, lightwell, associated paving and extension to existing parking area. Conversion of basement to form 1 x 2-bedroom flat (Amended description and plans to include revised site location plan)

As published by the council, reference 2020/1230

Application record

Reference
2020/1230
Type
Full planning
Status
Decision Determined
Decision
Approved
Received
12 Jul 2020
Validated
30 Jul 2020
Decided
6 Nov 2020
Ward
Whyteleafe
Parish
Whyteleafe
Postcode
CR3 0AP

Timeline

Dates from the published record

  1. 12 Jul 2020

    Received by Tandridge

  2. 30 Jul 2020

    Validated

    Checked as complete and ready for consideration.

  3. 6 Nov 2020

    Decision issued: Approved

  4. 2 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

44 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Tandridge

  • 2025/1471 Refused

    Brookfield, Westerham Road, Limpsfield, Oxted, Surrey, RH8 0EE

    Erection of 6x dwellings with parking, access and landscaping as phased development. Phase 1: Infrastructure and roads. Phase 2: Erection of dwellings.

    12 Dec 2025 Full applications
  • 2026/1034 Decided

    24 Chaldon Road, Caterham, Surrey, CR3 5PE

    Replacement of existing timber-framed shopfront with a new powder-coated aluminium shopfront finished in RAL Black Matt, including replacement glazing and entrance door

    1 Sep 2026 Full applications
  • 2026/1027 Decided

    Stock Cottage, Bones Lane, Newchapel, Lingfield, Surrey, RH7 6HR

    Change of use from residential to a children's day nursery with creation of a new internal access track

    1 Sep 2026 Full applications
  • 2026/313 Granted

    Evergreen, Kings Cross Lane, South Nutfield, Redhill, Surrey, RH1 5NS

    Demolition of existing dwelling and garage, erection of new dwelling and associated external works.

    24 Apr 2026 Full applications
  • 2026/141 Refused

    Standitch Farm, Tilburstow Hill Road, Godstone, Surrey, RH9 8LY

    Conversion of stable block to form 1no. 2-bed dwelling and the conversion and extension of the dairy building to form 1no. 3-bed dwelling following demolition of outbuilding. (Amended site area)

    25 Mar 2026 Full applications