Skip to content
PlanIndex Get alerts
Menu

Planning application

77 Parkfield Crescent Two Gates Tamworth B77 1HB

Granted Tamworth 0435/2019 Householder Prior Approval Notification

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Prior notification:3.28m rear single storey extension with an eaves height 2.76m and a maximum overall height of 3.9m

As published by the council, reference 0435/2019

Application record

Reference
0435/2019
Type
Householder Prior Approval Notification
Status
FINAL DECISION
Decision
Householder Prior Approval Not Required
Received
22 Oct 2019
Validated
22 Oct 2019
Decided
21 Nov 2019
Ward
Trinity
Decision by
Delegated
Postcode
B77 1HB

Timeline

Dates from the published record

  1. 22 Oct 2019

    Received by Tamworth

  2. 21 Nov 2019

    Decision issued: Householder Prior Approval Not Required

  3. 20 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

In Tamworth

  • 0149/2026 Refused

    Land to the North of Moor Lane,adjacent to railway line ,Bolehall ,Tamworth

    Prior Approval Notification : Change of use of an agricultural unit to a (B8) use for Storage

    26 Jun 2026 Prior approval
  • 0134/2026 Granted

    Units 9 - 10 Two Gates Trading Estate, Watling Street,Two Gates,Tamworth,Staffordshire,B77 5AE

    Prior Approval: Installation of solar photovoltaic equipment to the roof area.

    3 Jun 2026 Prior approval
  • 0159/2026 Awaiting decision

    Steven Eagell Toyota Tamworth Ventura Park Road Tamworth Staffordshire B78 3HL

    Prior Notification : Installation of roof mounted 97.52kW solar PV system comprising of 212 x Canadian Solar 460w modules

    6 Jul 2026 Prior approval
  • 0141/2026 Awaiting decision

    24 Gillway Lane Tamworth Staffordshire B79 8PL

    Prior Notification for larger single storey rear extension: Depth: 5m eaves height: 3.30m and a maximum height of 3.30m

    16 Jun 2026 Prior approval
  • 0132/2026 Withdrawn

    16 Fontenaye Road Tamworth Staffordshire B79 8JZ

    Prior Notification for larger single storey rear extension: Depth: 3.50m eaves height: 2.90m and a maximum height of 3.50m

    2 Jun 2026 Prior approval