Skip to content
PlanIndex Get alerts
Menu

Planning application

22 Curzon Road Ashton-under-lyne Tameside OL6 6PS

Granted Tameside 26/00578/HHPD

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension. The length of the extension from the rear of the original house by 4.0m. Maximum height of the extension 3.7m. Maximum height of eaves 2.30m

As published by the council, reference 26/00578/HHPD

Application record

Reference
26/00578/HHPD
Status
Decided
Decision
Granted As published: Approve
Received
13 Jul 2026
Validated
16 Jul 2026
Decided
25 Aug 2026
Ward
Ashton-under-Lyne St Michaels
Parish
Ashton-under-lyne
Decision by
Delegated Decision
Postcode
OL6 6PS

Site history

Applications at this address on the Tameside register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • 26/00113/FUL Granted

    22 Curzon Road Ashton-under-lyne Tameside OL6 6PS

    Single Storey Rear Extension

    Decided 2 Jul 2026 Full applications

Timeline

Dates from the published record

  1. 13 Jul 2026

    Received by Tameside

  2. 16 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. 25 Aug 2026

    Decision issued: Approve

Documents

The council's own list, drawings first

3 documents on file for this application

Drawings (1)

  • Location plan existing & proposed plans 13 Jul 2026

Everything on file (3)

  • DECISION NOTICE Decision · 25 Aug 2026
  • APPLICATION FORM Application Form · 16 Jul 2026
  • LOCATION PLAN, EXISTING & PROPOSED PLANS Drawings · 13 Jul 2026

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you the drawings on every job in your area. 14 days free.

What this grant of permission means

Tameside granted permission on 25 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Tameside's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles