Skip to content
PlanIndex Get alerts
Menu

Planning application

10 Four Lanes Mottram Tameside SK14 6PP

Granted Tameside 26/00482/CPUD

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed garage conversion, installation of window in place of garage door to front elevation and door to side elevation with associated works.

As published by the council, reference 26/00482/CPUD

Application record

Reference
26/00482/CPUD
Status
Decided
Decision
Granted As published: Approve
Received
15 Jun 2026
Validated
15 Jun 2026
Decided
1 Sep 2026
Ward
Longdendale
Parish
Longdendale
Postcode
SK14 6PP

Timeline

Dates from the published record

  1. 15 Jun 2026

    Received by Tameside

  2. 21 Jul 2026

    Added to PlanIndex

  3. 1 Sep 2026

    Decision issued: Approve

  4. 10 Sep 2026

    Status changed to Decided

    Previously Awaiting decision.

Documents

The council's own list, drawings first

10 documents on file for this application

Drawings (5)

  • Proposed block plan 20 Aug 2026
  • Floor plans 20 Aug 2026
  • Elevation plans 20 Aug 2026
  • Location plan 20 Aug 2026
  • Existing block plan 20 Aug 2026

Everything on file (10)

  • DELEGATED REPORT Officer Report · 01 Sep 2026
  • DECISION NOTICE Decision · 01 Sep 2026
  • LOCATION PLAN Revised Drawings · 20 Aug 2026
  • SITE PHOTOGRAPH Background Papers · 20 Aug 2026
  • ELEVATION PLANS Revised Drawings · 20 Aug 2026
  • FLOOR PLANS Revised Drawings · 20 Aug 2026
  • PROPOSED BLOCK PLAN Revised Drawings · 20 Aug 2026
  • EXISTING BLOCK PLAN Revised Drawings · 20 Aug 2026
  • APPLICATION FORM Application Form · 15 Jun 2026
  • PLANNING STATEMENT Background Papers · 15 Jun 2026

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you the drawings on every job in your area. 14 days free.

What this grant of permission means

Tameside granted permission on 1 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Tameside's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles