Planning application
Land And Buildings On The South East Side Of Printworks Road Stalybridge Tameside
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of Conditions 2, 3, 6, 7, 8, 10, 11, 13, 14, 17, 18, 19 and addition of Condition 20 for scheme phasing and layout flexibility; of planning permission 23/00770/FUL for the Development of a Battery Storage Facility, associated infrastructure, earthworks, and means of access
As published by the council, reference 26/00396/FUL
Application record
- Reference
- 26/00396/FUL
- Category
- Full applications
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 6 May 2026
- Validated
- 6 May 2026
- Decided
- 28 Jul 2026
- Ward
- Stalybridge North
- Parish
- Stalybridge
- Decision by
- Committee (Speakers Panel) Decision
Timeline
Dates from the published record
-
6 May 2026
Received by Tameside
-
21 Jul 2026
Added to PlanIndex
-
28 Jul 2026
Decision issued: Approve
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
26/00079/PLCOND Granted
Land And Buildings On The South East Side Of Printworks Road Stalybridge Tameside SK15 3AZ
Discharge of Condition 7 (CEMP) and Condition 14 (Environmental Method Statement) of planning reference 26/00396/FUL
- Application: 23/00770/FUL (Decided)
Documents
The council's own list, drawings first
20 documents on file for this application
Drawings (1)
- Amended phasing plan
Everything on file (20)
- COMMITTEE REPORT
- DECISION NOTICE
- AMENDED PHASING PLAN
- CONSULTEE COMMENT - NATURAL ENG, 02.07.2026
- CONSULTATION RESPONSE - ECOLOGY
- CONSULTEE COMMENT - ENVAGE - 01.06.2026
- CONSULTEE COMMENT, ENVHEALTH - 28.05.2026
- CONSULTATION RESPONSE - TRANSPORT FOR GREATER MANCHESTER
- CONSULTATION RESPONSE - CANAL & RIVER TRUST
- CONSULTATION RESPONSE - CONTAMINATED LAND
- CONSULTATION RESPONSE - GREATER MANCHESTER ARCHEOLOGICAL ADVISORY SERVICE (GMAAS
- CONSULTEE COMMENT - TREES 19.05.2026
- CONSULTEE COMMENT - NETWORK RAIL - 15.05.2026
- CONSULTATION RESPONSE - COAL AUTHORITY
- CONSULTATION RESPONSE - WASTE SERVICES
- CONSULTATION RESPONSE - LOCAL HIGHWAYS AUTHORITY
- CONSULTATION RESPONSE - LLFA
- APPLICATION FORM - WITHOUT PERSONAL DATA
- COVERING LETTER
- LANARKSHIRE DECISION NOTICE
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What this grant of permission means
Tameside granted permission on 28 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Tameside
-
26/00900/FUL Awaiting decision
7 Winchester Avenue Ashton-under-lyne Tameside OL6 8BU
Single storey rear extension
-
26/00895/FUL Awaiting decision
231 Marlborough Street Ashton-under-lyne Tameside OL7 0HS
Proposed single storey rear and single storey side wraparound extension
-
26/00896/FUL Awaiting decision
2 Lord Derby Road Hyde Tameside SK14 5EQ
Demolition of existing garage and construction of single storey front/side extension
-
26/00890/FUL Awaiting decision
1 Tetlowfold Cottage Tetlow Fold Hyde Tameside SK14 3BU
Double storey side extension, existing ridge height increased and new porch.
-
26/00892/FUL Awaiting decision
27 Edna Street Hyde Tameside SK14 1LD
Removal of Condition 3 (Contaminated Land) of planning permission 19/00020/FUL (3no. Dwelling houses)