Skip to content
PlanIndex Get alerts
Menu

Planning application

68 Clarendon Road Audenshaw Tameside M34 5QB

Awaiting decision Tameside 26/00339/FUL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Propose to erect a double storey side and single storey rear extension to increase living accommodation.

As published by the council, reference 26/00339/FUL

Application record

Reference
26/00339/FUL
Type
Full Planning Permission
Status
Awaiting decision
Received
20 Apr 2026
Validated
5 May 2026
Ward
Audenshaw
Parish
Denton/Audenshaw
Postcode
M34 5QB

Timeline

Dates from the published record

  1. 20 Apr 2026

    Received by Tameside

  2. 5 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 30 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Tameside took a median of 54 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

NK Architectural Agent, an architecture practice

58 applications on PlanIndex · across 10 councils · 64% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

  • AMENDED PROPOSED SITE AND LOCATION PLAN Revised Drawings · 02 Jul 2026
  • AMENDED PROPOSED GF AND 1ST FLOOR PLAN Revised Drawings · 30 Jun 2026
  • AMENDED PROPOSED ELEVATIONS Revised Drawings · 30 Jun 2026
  • CONSULTEE COMMENT - LHA Consultee Comment · 08 May 2026
  • APPLICATION FORM Application Form · 20 Apr 2026
  • THE LOCATION PLAN Drawings · 20 Apr 2026
  • EXISTING GF & 1ST FLOOR PLAN Drawings · 20 Apr 2026
  • EXISTING ELEVATIONS Drawings · 20 Apr 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Tameside for determination, against a statutory target of eight weeks. Over the last year Tameside decided full applications in a median of 62 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Tameside

  • 26/00726/FUL Awaiting decision

    41 Clough Fold Road Hyde Tameside SK14 5AQ

    Single storey front extension

    17 Sep 2026 Full applications
  • 26/00725/FUL Awaiting decision

    419 Manchester Road Mossley Tameside OL5 9BG

    Proposed single storey ground floor rear extension

    16 Sep 2026 Full applications
  • 26/00723/FUL Awaiting decision

    Unit 6 Gatefield Works Whitelands Road Ashton-under-lyne Tameside OL6 6UG

    Change of Use from general industrial (B2) to food preparation and sales (Sui Generis) (RETROSPECTIVE)

    15 Sep 2026 Full applications
  • 26/00721/FUL Awaiting decision

    44 Wheatfield Stalybridge Tameside SK15 2TZ

    Erection of a double garage and bike store. Extension of existing driveway to create a turning circle at the front of the house and to meet the new double garage.

    15 Sep 2026 Full applications
  • 26/00462/FUL Refused

    54 Arundel Street Ashton-under-lyne Tameside OL6 6RG

    Change of use of dwellinghouse (use class C3) to small HMO for occupation by three residents (use class C4)

    8 Jun 2026 Full applications