Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Mallard Close Dukinfield Tameside SK16 5QD

Granted Tameside 26/00331/FUL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey side extension

As published by the council, reference 26/00331/FUL

Application record

Reference
26/00331/FUL
Type
Full Planning Permission
Status
Decided
Decision
Approve
Received
16 Apr 2026
Validated
16 Apr 2026
Decided
10 Jun 2026
Ward
Dukinfield
Parish
Dukinfield
Decision by
Delegated Decision
Postcode
SK16 5QD

Timeline

Dates from the published record

  1. 16 Apr 2026

    Received by Tameside

  2. 10 Jun 2026

    Decision issued: Approve

  3. 24 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Manchester

11 applications on PlanIndex · across 5 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 108 Birch Lane Dukinfield Tameside SK16 4AT

    26/00446/FUL Submitted 29 May 2026 209m away

    91% historically approved · decision due ~24 Jul

    Demolition of existing porch and construction of replacement front porch

    Decided Full applications Extension Demolition
    Small domestic
  • 30 Kenyon Avenue Dukinfield Tameside SK16 5AR

    26/00220/FUL Submitted 13 Mar 2026 216m away

    Loft conversion with front and rear dormers. Single storey rear extension and other external alterations including render to all elevations and pergola to the side elevation.

    Granted Full applications Extension Loft or dormer 13 docs
    Small domestic
  • 250 Birch Lane Dukinfield Tameside SK16 5AP

    26/00533/CLUD Submitted 30 Jun 2026 239m away

    Lawful Development Certificate for Existing Use: Conversion of the property from residential (Use Class C3) to HMO for up to 4 persons (Use Class C4) having been this continuously since January 2023.

    Granted Amendments 7 docs
  • 1 Westmorland Avenue Dukinfield Tameside SK16 5JA

    21/00581/FUL Submitted 28 Apr 2021 312m away

    Detached Garage to side of existing property

    Granted Full applications 4 docs
  • 38 Westmorland Avenue Dukinfield Tameside SK16 5JA

    26/00456/CPUD Submitted 5 Jun 2026 346m away

    91% historically approved · decision due ~31 Jul

    Single storey side extension

    Decided Extension 4 docs
    Small domestic
  • 49 Westmorland Avenue Dukinfield Tameside SK16 5JA

    21/00822/FUL Submitted 30 Jun 2021 353m away

    91% historically approved · decision due ~25 Aug

    PROPOSED LOFT CONVERSION WITH FRONT & REAR DORMER

    Awaiting decision Full applications Loft or dormer 6 docs

In Tameside

  • 26/00695/FUL Awaiting decision

    74 Thompson Road Denton Tameside M34 2PN

    Single storey detached outbuilding

    2 Sep 2026 Full applications
  • 26/00693/FUL Awaiting decision

    La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP

    Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger

    1 Sep 2026 Full applications
  • 26/00692/FUL Awaiting decision

    9 Cook Street Audenshaw Tameside M34 5DB

    Single storey rear and side extension

    28 Aug 2026 Full applications
  • 26/00686/FUL Awaiting decision

    10 Ostlers Gate Droylsden Tameside M43 7EU

    Removal of existing conservatory and construction of new single storey rear extension

    27 Aug 2026 Full applications
  • 26/00684/FUL Awaiting decision

    6 Warwick Grove Audenshaw Tameside M34 5QT

    Proposed double storey side extension

    26 Aug 2026 Full applications