Planning application
147 - 155 Stamford Street Central Ashton-under-lyne Tameside OL6 6XW
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
External alterations to retail/warehouse to include alterations to external materials and fenestration plus canopy to external stairway and removal of chimney stack.
As published by the council, reference 26/00279/FUL
Application record
- Reference
- 26/00279/FUL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approve
- Received
- 31 Mar 2026
- Validated
- 2 Apr 2026
- Decided
- 27 May 2026
- Ward
- Ashton-under-Lyne St Peters
- Parish
- Ashton-under-Lyne
- Decision by
- Delegated Decision
- Postcode
- OL6 6XW
Timeline
Dates from the published record
-
31 Mar 2026
Received by Tameside
-
2 Apr 2026
Validated
Checked as complete and ready for consideration.
-
27 May 2026
Decision issued: Approve
-
24 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy
6 applications on PlanIndex · across 2 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
147 - 155 Stamford Street Central Ashton-under-lyne Tameside OL6 6XW
Prior Approval application for the change of use of partial ground floor, the complete first, second and third floor from Commercial, Business and Service (Use Class E) to 17no. 1 bedroom apartments and 5no. 2 bedroom apartments, (Use Class C3) under the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) - Schedule 2, Part 3, Class MA.
Granted Full applications New dwelling 14 docs -
4 Church Street Ashton-under-lyne Tameside OL6 6XE
Discharge of conditions 3 (materials), 9 (road traffic noise) and 17 (window openings) of planning permission 21/00205/FUL
Granted Conditions Windows or glazing 12 docs -
Camden House 2 Grey Street Ashton-Under-Lyne Tameside OL6 6XF
Change of use offices to 21 apartments under Class O of Part 3 of Schedule 2 of the Town and Country Planning General Permitted Development Order 2015
Granted Full applications New dwelling 9 docsMajor scheme -
18 Church Street Ashton-Under-Lyne Tameside OL6 6XE
Change of use - existing offices (Class E) to 7no. bedroom HMO (Sui Generis)
Granted Full applications 7 docs -
14 Wood Street Ashton-under-lyne Tameside OL6 6AT
91% historically approved · decision due ~16 Sep
Lawful Development Certificate for existing use of the property as a 1 bedroom dwellinghouse (Use Class C3) having been this continuously since November 2020.
Awaiting decision 19 docsDomestic -
9 Wellington Street Ashton-Under-Lyne Tameside OL6 6AJ
Certificate of lawful of commencement of planning application reference 05/00287/FUL - New residential and commercial development comprising ground floor retail unit and 14no. apartments (4 storeys)
Refused Amendments New dwelling 8 docsMajor scheme
Other full applications applications
In Tameside
-
26/00695/FUL Awaiting decision
74 Thompson Road Denton Tameside M34 2PN
Single storey detached outbuilding
-
26/00693/FUL Awaiting decision
La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP
Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger
-
26/00692/FUL Awaiting decision
9 Cook Street Audenshaw Tameside M34 5DB
Single storey rear and side extension
-
26/00686/FUL Awaiting decision
10 Ostlers Gate Droylsden Tameside M43 7EU
Removal of existing conservatory and construction of new single storey rear extension
-
26/00684/FUL Awaiting decision
6 Warwick Grove Audenshaw Tameside M34 5QT
Proposed double storey side extension