Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Of Greaves Street Mossley Tameside OL5 0QH

Refused Tameside 26/00122/FUL Full Planning Permission

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Erection of a pair of semi-detached three bedroom dwellings, with associated parking, landscaping, and access

As published by the council, reference 26/00122/FUL

Application record

Reference
26/00122/FUL
Type
Full Planning Permission
Status
Decided
Decision
Refuse
Received
10 Feb 2026
Validated
10 Mar 2026
Decided
19 Jun 2026
Ward
Mossley
Parish
Mossley
Decision by
Delegated Decision
Postcode
OL5 0QH

Timeline

Dates from the published record

  1. 10 Feb 2026

    Received by Tameside

  2. 10 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 19 Jun 2026

    Decision issued: Refuse

  4. 24 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in Oldham

33 applications on PlanIndex · across 10 councils · 80% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Land Adj 19 Greaves Street Mossley Tameside

    19/00940/FUL Submitted 16 Oct 2019 1m away

    Proposed Residential development comprising terrace of 6 x 1-bed bungalows with gardens to rear and associated works.

    Refused Full applications New dwelling 11 docs
  • Car Park At Cross Street Mossley

    21/00049/PLCOND Submitted 18 Apr 2021 49m away

    Discharge of condition no. 7 of 18/00756/FUL (Ground Contamination) of approved application 18/00756/FUL Groundsure Enviro All-in-One Report - MR-51002126299001-1558527728645

    Granted Conditions 4 docs
  • Land On Stamford Road Formerly Stamford Heights Mossley

    23/00751/FUL Submitted 15 Aug 2023 104m away

    Construction of 7no. 2 bedroom terraced dwellings and ancillary works

    Granted Full applications 47 docs
  • Land On Stamford Road Formerly Stamford Heights Mossley

    26/00003/PLCOND Submitted 20 Jan 2026 107m away

    100% historically approved · decision due ~17 Mar

    Full discharge of Condition 6 (Remediation Strategy), Condition 10 (Noise Mitigation), Condition 11 (Surface Water Drainage), Condition 13 (Slope Assessment), Condition 15 (Highway Works) and Condition 19 (Invasive Species) of planning reference 23/00751/FUL

    Awaiting decision Conditions 19 docs
  • Marton House Shire Croft Mossley Tameside OL5 0AR

    26/00026/TPO Submitted 18 May 2026 160m away

    T1 Sycamore - Pruning as per submitted diagram T2 Ash - Pruning as per submitted diagram

    Granted Trees 5 docs
  • Nield Street / Smith Street Mossley Tameside OL5 0PF

    20/01253/FUL Submitted 30 Dec 2020 182m away

    Residential development comprising of 31No. 1 bedroom retirement living apartments with associated landscaping and external works including demolition of existing warehouse

    Granted Full applications New dwelling Demolition 32 docs

In Tameside

  • 26/00695/FUL Awaiting decision

    74 Thompson Road Denton Tameside M34 2PN

    Single storey detached outbuilding

    2 Sep 2026 Full applications
  • 26/00693/FUL Awaiting decision

    La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP

    Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger

    1 Sep 2026 Full applications
  • 26/00692/FUL Awaiting decision

    9 Cook Street Audenshaw Tameside M34 5DB

    Single storey rear and side extension

    28 Aug 2026 Full applications
  • 26/00686/FUL Awaiting decision

    10 Ostlers Gate Droylsden Tameside M43 7EU

    Removal of existing conservatory and construction of new single storey rear extension

    27 Aug 2026 Full applications
  • 26/00684/FUL Awaiting decision

    6 Warwick Grove Audenshaw Tameside M34 5QT

    Proposed double storey side extension

    26 Aug 2026 Full applications