Planning application

Caroline Street - Empty Site Located Between Caroline Street, Bridge Street And The River Tame Stalybridge Tameside

Granted Tameside 25/00655/FUL Full applications

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Site remediation ground works including site clearance and engineering operations to remove associated contamination and former industrial legacy structures

As published by the council, reference 25/00655/FUL

Application record

Reference
25/00655/FUL
Category
Full applications
Status
Decided
Decision
Granted As published: Approve
Received
8 Aug 2025
Validated
11 Aug 2025
Decided
8 Jul 2026
Ward
Dukinfield/Stalybridge
Parish
Stalybridge
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 8 Aug 2025

    Received by Tameside

  2. 11 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 8 Jul 2026

    Decision issued: Approve

  4. 21 Jul 2026

    Added to PlanIndex

Documents

The council's own list, drawings first

37 documents on file for this application

Drawings (2)

  • The location plan 08 Aug 2025
  • Site location & boundary plan 08 Aug 2025

Everything on file (37)

  • DECISION NOTICE Decision · 08 Jul 2026
  • DELEGATED REPORT Officer Report · 08 Jul 2026
  • GMEU RESPONSE Consultee Comment · 26 May 2026
  • BIODIVERSITY ACCOUNTING ASSESSMENT ISSUE 4 R1 Background Papers · 18 May 2026
  • STATUTORY BIODIVERSITY METRIC CONDITION ASSESSMENTS Background Papers · 18 May 2026
  • STATUTORY BIODIVERSITY METRIC CALCULATION TOOL Background Papers · 18 May 2026
  • RIVER CONDITION Background Papers · 18 May 2026
  • CONSULTEE COMMENT - GMEU 13.05.2026 Consultee Comment · 13 May 2026
  • OTTER SURVEY & REPORT Background Papers · 14 Apr 2026
  • PRELIMINARY ECOLOGICAL APPRAISAL Background Papers · 14 Jan 2026
  • ARCHAEOLOGICAL DESK-BASED ASSESSMENT Background Papers · 07 Jan 2026
  • ODIVERSITY ACCOUNTING ASSESSMENT ISSUE 3 Background Papers · 31 Oct 2025
  • CONSULTATION RESPONSE - TREES Consultee Comment · 30 Sep 2025
  • CONSULTATION RESPONSE - TREES Consultee Comment · 30 Sep 2025
  • CONSULTATION RESPONSE - CANAL & RIVERS Consultee Comment · 22 Sep 2025
  • CONSULTATION RESPONSE - HSE Consultee Comment · 22 Sep 2025
  • CONSULTATION RESPONSE - ENVIRONMENT AGENCY Consultee Comment · 18 Sep 2025
  • CONSULTATION RESPONSE - COAL Consultee Comment · 02 Sep 2025
  • CONSULTATION RESPONSE - CONTAMINATED LAND Consultee Comment · 01 Sep 2025
  • PHASE I GEOENVIRONMENTAL SITE ASSESSMENT. SITE 4 REFERENCE: 17-436-R1-1 Background Papers · 01 Sep 2025
  • CONSULTATION RESPONSE - ENVIRO SERVICES Consultee Comment · 26 Aug 2025
  • CONSULTATION RESPONSE - LLFA Consultee Comment · 20 Aug 2025
  • CONSULTATION RESPONSE - ENGINEERING Consultee Comment · 20 Aug 2025
  • CONSULTATION RESPONSE - GMAAS Consultee Comment · 19 Aug 2025
  • CONSULTATION RESPONSE - GMEU Consultee Comment · 14 Aug 2025
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 08 Aug 2025
  • THE LOCATION PLAN Drawings · 08 Aug 2025
  • SITE LOCATION & BOUNDARY PLAN Drawings · 08 Aug 2025
  • SITE INVESTIGATION LOCATION PLAN Drawings · 08 Aug 2025
  • FIGURES Background Papers · 08 Aug 2025
  • CONTAMINATION DELINEATION REPORT AND REMEDIATION STRATEGY Background Papers · 08 Aug 2025
  • APPENDIX B ? PROFILE LOGS Background Papers · 08 Aug 2025
  • PHASE 2 GEO-ENVIRONMENTAL INVESTIGATION,RISK ASSESSMENTAND OUTLINE REMEDIATION S Background Papers · 08 Aug 2025
  • APPENDIX A ? RISK MATRIX Background Papers · 08 Aug 2025
  • APPENDIX A ? RISK MATRIX Background Papers · 08 Aug 2025
  • TRIAL PIT LOG Background Papers · 08 Aug 2025
  • APPENDIX C ? CERTIFICATES OF ANALYSIS (SOIL) Background Papers · 08 Aug 2025

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you the drawings on every job in your area. 14 days free.

What this grant of permission means

Tameside granted permission on 8 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Tameside

  • 26/00900/FUL Awaiting decision

    7 Winchester Avenue Ashton-under-lyne Tameside OL6 8BU

    Single storey rear extension

    19 Nov 2026 Full applications
  • 26/00895/FUL Awaiting decision

    231 Marlborough Street Ashton-under-lyne Tameside OL7 0HS

    Proposed single storey rear and single storey side wraparound extension

    Received 18 Nov, published by the council 20 Nov 2026 Full applications
  • 26/00896/FUL Awaiting decision

    2 Lord Derby Road Hyde Tameside SK14 5EQ

    Demolition of existing garage and construction of single storey front/side extension

    Received 18 Nov, published by the council 19 Nov 2026 Full applications
  • 26/00890/FUL Awaiting decision

    1 Tetlowfold Cottage Tetlow Fold Hyde Tameside SK14 3BU

    Double storey side extension, existing ridge height increased and new porch.

    Received 17 Nov, published by the council 20 Nov 2026 Full applications
  • 26/00892/FUL Awaiting decision

    27 Edna Street Hyde Tameside SK14 1LD

    Removal of Condition 3 (Contaminated Land) of planning permission 19/00020/FUL (3no. Dwelling houses)

    Received 17 Nov, published by the council 18 Nov 2026 Full applications