Planning application
Land Located Off Globe Lane Broadway Industrial Estate Newton Wood Dukinfield Tameside
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of Condition 3 (Materials), Condition 4 (Site Enclosure), Condition 5 (Contamination), Condition 7 (Drainage), Condition 8 (CEMP), Condition 9 (Secure Cycle Storage), Condition 11 (Construction Traffic Highways Integrity), Condition 14 (Travel Plan), Condition 16 (Lighting and Bus Stop Upgrades), Condition 17 (Highway Retaining Structures), Condition 19 (Biodiversity Enhancement), Condition 21 (Written Scheme of Investigation) of planning reference 22/01131/FUL
As published by the council, reference 25/00082/PLCOND
Application record
- Reference
- 25/00082/PLCOND
- Status
- Decided
- Decision
- Approve
- Received
- 3 Sep 2025
- Validated
- 3 Sep 2025
- Ward
- Dukinfield
- Parish
- Dukinfield
Timeline
Dates from the published record
-
3 Sep 2025
Received by Tameside
-
21 Jul 2026
Added to PlanIndex
-
16 Sep 2026
Status changed to Decided
Previously Awaiting decision.
Related applications
Cases linked to this one on the register
- Application: 22/01131/FUL (Decided)
Documents
Plans, drawings, consultee responses and the officer's report
50 documents on file for this application
- CONSULTATION RESPONSE - LOCAL HIGHWAYS AUTHORITY
- CONSULTEE COMMENT - CONTAM , 04.09.2026
- CONSULTEE COMMENT - CONTAM , 04.09.2026
- REMEDIATION ENABLING WORKS PLAN
- DQRA AND REMEDIATION OPTIONS APPRAISAL
- CONSULTATION RESPONSE - CONTAMINATED LAND
- SITE SET UP COMPOUND
- CONSTRUCTION PHASE PLAN
- RETAINING WALL CONSTRUCTION
- CONSULTEE COMMENT - ENVAGE, 02.07.2026
- DRAINAGE DETAILS (1 OF 2)
- DRAINAGE DETAILS (2 OF 2)
- CONSULTATION RESPONSE - ENVIRONMENT AGENCY
- CONSULTATION RESPONSE - CONTAMINATED LAND
- CONDITION 5 DISCHARGE LETTER
- CONSULTATION RESPONSE - LLFA
- CONSULTATION RESPONSE - CONTAMINATED LAND
- CONSULTATION RESPONSE - CONTAMINATED LAND
- PHASE 1 DESK STUDY
- PHASE 1 DESK STUDY
- CONSULTATION RESPONSE - LHA
- BUS STOP DESIGN GUIDE INDICATIVE STOP LAYOUT
- BUS STOP DESIGN GUIDE INDICATIVE STOP LAYOUT FLAG ONLY - 4 KERB - STANDARD
- CONSULTATION RESPONSE - ENVIRONMENT AGENCY
- PROPOSED DRAINAGE STRATEGY
- DQRA AND REMEDIATION OPTIONS APPRAISAL
- PHASE 2 GEO-ENVIRONMENTAL AND GEOTECHNICAL SITE INVESTIGATION
- AMENDED PROPOSED GATE DETAILS
- AMENDED PROPOSED BOUNDARY DETAILS
- CONSULTATION RESPONSE - CONTAMINATED LAND
- REMEDIATION ENABLING WORKS STRATEGY
- STRUCTURAL CALCULATIONS FOR RETAINING WALL
- CONSULTATION RESPONSE - GMEU
- AMENDED BIODIVERSITY ENHANCEMENT PLAN
- CONSULTATION RESPONSE - LHA
- CONSULTATION RESPONSE - LHA
- CONSULTATION RESPONSE - LHA
- CONSULTATION RESPONSE - CONTAMINATED LAND
- CONSULTATION RESPONSE - GMAAS
- HIGHWAY CONDITION SURVEY
- BIODIVERSITY STATEMENT PART 1
- BIODIVERSITY STATEMENT PART 2
- APPLICATION FORM
- EXTERNAL MATERIAL STUDY
- PROPOSED CYCLE ST DETAILS
- PHOTOGRAPHIC SURVEY REPORT
- TRAVEL PLAN
- TRAVEL INFORMATION PACK
- DESIGN NOTE
- ARCHAEOLOGICAL ASSESSMENT
Trade members open them from here.
Open the documentsWhat this grant of permission means
Tameside granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Tameside's portal will say. Our guide explains the common types.