Planning application

Land Located Off Globe Lane Broadway Industrial Estate Newton Wood Dukinfield Tameside

Granted Tameside 25/00082/PLCOND

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of Condition 3 (Materials), Condition 4 (Site Enclosure), Condition 5 (Contamination), Condition 7 (Drainage), Condition 8 (CEMP), Condition 9 (Secure Cycle Storage), Condition 11 (Construction Traffic Highways Integrity), Condition 14 (Travel Plan), Condition 16 (Lighting and Bus Stop Upgrades), Condition 17 (Highway Retaining Structures), Condition 19 (Biodiversity Enhancement), Condition 21 (Written Scheme of Investigation) of planning reference 22/01131/FUL

As published by the council, reference 25/00082/PLCOND

Application record

Reference
25/00082/PLCOND
Status
Decided
Decision
Approve
Received
3 Sep 2025
Validated
3 Sep 2025
Ward
Dukinfield
Parish
Dukinfield

Timeline

Dates from the published record

  1. 3 Sep 2025

    Received by Tameside

  2. 21 Jul 2026

    Added to PlanIndex

  3. 16 Sep 2026

    Status changed to Decided

    Previously Awaiting decision.

Cases linked to this one on the register

  • Application: 22/01131/FUL (Decided)

Documents

Plans, drawings, consultee responses and the officer's report

50 documents on file for this application

  • CONSULTATION RESPONSE - LOCAL HIGHWAYS AUTHORITY Consultee Comment · 08 Sep 2026
  • CONSULTEE COMMENT - CONTAM , 04.09.2026 Consultee Comment · 04 Sep 2026
  • CONSULTEE COMMENT - CONTAM , 04.09.2026 Consultee Comment · 04 Sep 2026
  • REMEDIATION ENABLING WORKS PLAN Background Papers · 24 Aug 2026
  • DQRA AND REMEDIATION OPTIONS APPRAISAL Background Papers · 24 Aug 2026
  • CONSULTATION RESPONSE - CONTAMINATED LAND Consultee Comment · 13 Jul 2026
  • SITE SET UP COMPOUND Drawings · 09 Jul 2026
  • CONSTRUCTION PHASE PLAN Background Papers · 09 Jul 2026
  • RETAINING WALL CONSTRUCTION Background Papers · 09 Jul 2026
  • CONSULTEE COMMENT - ENVAGE, 02.07.2026 Consultee Comment · 03 Jul 2026
  • DRAINAGE DETAILS (1 OF 2) Drawings · 09 Jun 2026
  • DRAINAGE DETAILS (2 OF 2) Drawings · 09 Jun 2026
  • CONSULTATION RESPONSE - ENVIRONMENT AGENCY Consultee Comment · 24 Apr 2026
  • CONSULTATION RESPONSE - CONTAMINATED LAND Consultee Comment · 25 Feb 2026
  • CONDITION 5 DISCHARGE LETTER Background Papers · 18 Feb 2026
  • CONSULTATION RESPONSE - LLFA Consultee Comment · 13 Feb 2026
  • CONSULTATION RESPONSE - CONTAMINATED LAND Consultee Comment · 03 Feb 2026
  • CONSULTATION RESPONSE - CONTAMINATED LAND Consultee Comment · 03 Feb 2026
  • PHASE 1 DESK STUDY Background Papers · 30 Jan 2026
  • PHASE 1 DESK STUDY Background Papers · 30 Jan 2026
  • CONSULTATION RESPONSE - LHA Consultee Comment · 29 Jan 2026
  • BUS STOP DESIGN GUIDE INDICATIVE STOP LAYOUT Drawings · 28 Jan 2026
  • BUS STOP DESIGN GUIDE INDICATIVE STOP LAYOUT FLAG ONLY - 4 KERB - STANDARD Drawings · 28 Jan 2026
  • CONSULTATION RESPONSE - ENVIRONMENT AGENCY Consultee Comment · 26 Jan 2026
  • PROPOSED DRAINAGE STRATEGY Drawings · 22 Jan 2026
  • DQRA AND REMEDIATION OPTIONS APPRAISAL Background Papers · 19 Jan 2026
  • PHASE 2 GEO-ENVIRONMENTAL AND GEOTECHNICAL SITE INVESTIGATION Background Papers · 19 Jan 2026
  • AMENDED PROPOSED GATE DETAILS Revised Drawings · 15 Jan 2026
  • AMENDED PROPOSED BOUNDARY DETAILS Revised Drawings · 15 Jan 2026
  • CONSULTATION RESPONSE - CONTAMINATED LAND Consultee Comment · 12 Jan 2026
  • REMEDIATION ENABLING WORKS STRATEGY Background Papers · 23 Dec 2025
  • STRUCTURAL CALCULATIONS FOR RETAINING WALL Background Papers · 10 Dec 2025
  • CONSULTATION RESPONSE - GMEU Consultee Comment · 13 Oct 2025
  • AMENDED BIODIVERSITY ENHANCEMENT PLAN Revised Drawings · 10 Oct 2025
  • CONSULTATION RESPONSE - LHA Consultee Comment · 29 Sep 2025
  • CONSULTATION RESPONSE - LHA Consultee Comment · 29 Sep 2025
  • CONSULTATION RESPONSE - LHA Consultee Comment · 29 Sep 2025
  • CONSULTATION RESPONSE - CONTAMINATED LAND Consultee Comment · 23 Sep 2025
  • CONSULTATION RESPONSE - GMAAS Consultee Comment · 10 Sep 2025
  • HIGHWAY CONDITION SURVEY Background Papers · 04 Sep 2025
  • BIODIVERSITY STATEMENT PART 1 Background Papers · 04 Sep 2025
  • BIODIVERSITY STATEMENT PART 2 Background Papers · 04 Sep 2025
  • APPLICATION FORM Application Form · 03 Sep 2025
  • EXTERNAL MATERIAL STUDY Drawings · 03 Sep 2025
  • PROPOSED CYCLE ST DETAILS Drawings · 03 Sep 2025
  • PHOTOGRAPHIC SURVEY REPORT Background Papers · 03 Sep 2025
  • TRAVEL PLAN Background Papers · 03 Sep 2025
  • TRAVEL INFORMATION PACK Background Papers · 03 Sep 2025
  • DESIGN NOTE Background Papers · 03 Sep 2025
  • ARCHAEOLOGICAL ASSESSMENT Background Papers · 03 Sep 2025

Trade members open them from here.

Open the documents

What this grant of permission means

Tameside granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Tameside's portal will say. Our guide explains the common types.