7 Wesley Drive Ashton-under-lyne Tameside OL6 8BG
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing conservatory and construction of single storey side and rear extension to existing dwelling
As published by the council, reference 24/00900/FUL
Application record
- Reference
- 24/00900/FUL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approve
- Received
- 7 Oct 2024
- Validated
- 7 Oct 2024
- Decided
- 29 Nov 2024
- Ward
- Ashton-Under-Lyne Hurst
- Parish
- Ashton-under-Lyne
- Decision by
- Delegated Decision
- Postcode
- OL6 8BG
Timeline
Dates from the published record
-
7 Oct 2024
Received by Tameside
-
29 Nov 2024
Decision issued: Approve
-
15 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in High Peak
28 applications on PlanIndex · across 7 councils · 78% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
91 Lees Road Ashton Tameside OL6 8BQ
Two storey side extension and rear conservatory
Granted Full applications Extension 1 doc -
Former Hartshead High School Greenhurst Road Ashton-Under-Lyne Tameside OL6 9DP
Permission to erect three monolith signs and 11 flagpole signs located on the site boundary of a residential development.
Granted Advertising New dwelling 5 docs -
241 Broadoak Road Ashton-Under-Lyne Tameside OL6 8RP
Front dormer extension and other external alterations including render to the front elevation (retrospective)
Granted Full applications Extension Loft or dormer 7 docs -
Former Hartshead High School Greenhurst Road Ashton-Under-Lyne OL6 9DP
Discharge of condition 6 (Secured by Design accreditation to Greater Manchester Police scheme) of planning permission 19/00558/REM.
Granted Conditions 5 docs -
Former Hartshead High School Greenhurst Road Ashton-Under-Lyne Tameside OL6 9DP
Full discharge of Condition 17 (road works and traffic management measures) of planning reference 18/01117/FUL
Granted Conditions 8 docs -
41 St Christophers Road Ashton-Under-Lyne Tameside OL6 9DP
Demolition/removal of existing ground floor lean-to side/rear extension and replacement with two storey side/rear extension and the creation of a balcony to the rear.
Granted Full applications Extension Demolition 3 docs
Other full applications applications
In Tameside
-
26/00695/FUL Awaiting decision
74 Thompson Road Denton Tameside M34 2PN
Single storey detached outbuilding
-
26/00693/FUL Awaiting decision
La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP
Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger
-
26/00692/FUL Awaiting decision
9 Cook Street Audenshaw Tameside M34 5DB
Single storey rear and side extension
-
26/00686/FUL Awaiting decision
10 Ostlers Gate Droylsden Tameside M43 7EU
Removal of existing conservatory and construction of new single storey rear extension
-
26/00684/FUL Awaiting decision
6 Warwick Grove Audenshaw Tameside M34 5QT
Proposed double storey side extension