Skip to content
PlanIndex Get alerts
Menu

Planning application

Mossley Wastewater Treatment Works Sewage Works Blackrock Stalybridge Tameside OL5 9QG

Granted Tameside 24/00772/FUL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of 8 No. kiosks required in connection with wider permitted development works

As published by the council, reference 24/00772/FUL

Application record

Reference
24/00772/FUL
Type
Full Planning Permission
Status
Decided
Decision
Approve
Received
28 Aug 2024
Validated
28 Aug 2024
Decided
19 Dec 2024
Ward
Stalybridge North
Parish
Mossley
Decision by
Delegated Decision
Postcode
OL5 9QG

Timeline

Dates from the published record

  1. 28 Aug 2024

    Received by Tameside

  2. 19 Dec 2024

    Decision issued: Approve

  3. 6 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Lingley Green Avenue Great

17 applications on PlanIndex · across 10 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

32 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Land At Former Hartshead Power Station And Millbrook Sidings Millbrook Stalybridge

    21/00987/FUL Submitted 2 Aug 2021 179m away

    Demolition of existing structures, remediation of the land and change of use of the land to form an ecological enhancement area, 162 new residential dwellings, creation of new access roads within and into the site, provision of landscaping, pedestrian and cycle routes and public and private parking areas.

    Granted Full applications Demolition 138 docs
  • 16 Boundary Close Mossley Tameside OL5 9QE

    26/00448/CPUD Submitted 1 Jun 2026 182m away

    91% historically approved · decision due ~27 Jul

    PROPOSED SINGLE STOREY SIDE & REAR EXTENSIONS

    Decided Extension 7 docs
    Small domestic
  • Spring Bank Lane Overbridge MVL3/9 Spring Bank Lane Stalybridge Tameside SK15 3BD

    26/00055/PLCOND Submitted 17 Jun 2026 225m away

    Part discharge of Condition 3 (Materials) and Condition 6 (Method Statement) and full discharge of Condition 4 (Scoping Plan), Condition 5 (Lime Mortar), and Condition 7 (Toolbox Talks) of planning reference 26/00021/LBC.

    Granted Conditions 3 docs
  • 24 Chamberlain Road Stalybridge Tameside SK15 3BR

    21/00378/FUL Submitted 19 Mar 2021 335m away

    Two storey side extension (re-submission further to 20/01174/FUL)

    Granted Full applications Extension 8 docs
  • 12 Hall Avenue Stalybridge Tameside SK15 3DF

    21/00039/FUL Submitted 13 Jan 2021 357m away

    Change of Use from vacant use to garden use, and retention of existing decking

    Refused Full applications 9 docs
  • 5 Hall Avenue Stalybridge Tameside SK15 3DF

    21/00709/FUL Submitted 30 May 2021 433m away

    Proposed Single storey side extension and rear Dormer, other external alterations

    Granted Full applications Extension Loft or dormer 4 docs
    Small domestic

In Tameside

  • 26/00695/FUL Awaiting decision

    74 Thompson Road Denton Tameside M34 2PN

    Single storey detached outbuilding

    2 Sep 2026 Full applications
  • 26/00693/FUL Awaiting decision

    La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP

    Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger

    1 Sep 2026 Full applications
  • 26/00692/FUL Awaiting decision

    9 Cook Street Audenshaw Tameside M34 5DB

    Single storey rear and side extension

    28 Aug 2026 Full applications
  • 26/00686/FUL Awaiting decision

    10 Ostlers Gate Droylsden Tameside M43 7EU

    Removal of existing conservatory and construction of new single storey rear extension

    27 Aug 2026 Full applications
  • 26/00684/FUL Awaiting decision

    6 Warwick Grove Audenshaw Tameside M34 5QT

    Proposed double storey side extension

    26 Aug 2026 Full applications