Planning application
31 Carlisle Crescent Ashton-under-lyne Tameside OL6 8UJ
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Front porch extension, wall render to the front elevation, outbuilding to the rear with associated cover attached to the rear elevation(retrospective)
As published by the council, reference 24/00765/FUL
Application record
- Reference
- 24/00765/FUL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approve
- Received
- 23 Aug 2024
- Validated
- 21 Oct 2024
- Decided
- 10 Dec 2024
- Ward
- Ashton-Under-Lyne Hurst
- Parish
- Ashton-under-lyne
- Decision by
- Delegated Decision
- Postcode
- OL6 8UJ
Timeline
Dates from the published record
-
23 Aug 2024
Received by Tameside
-
21 Oct 2024
Validated
Checked as complete and ready for consideration.
-
10 Dec 2024
Decision issued: Approve
-
24 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Hartshead Service Station St Albans Avenue Ashton-under-lyne Tameside OL6 8TU
91% historically approved · decision due ~24 Aug
Installation of a modular self-service launderette facility and associated works (Retrospective)
Awaiting decision Full applications 11 docs -
17 Brecon Crescent Ashton-Under-Lyne Tameside OL6 8UA
Proposed single storey rear extension and other external alterations including new roof light to side of property
Granted Full applications Extension Loft or dormer +1 4 docsSmall domestic -
14 Whernside Avenue Ashton-Under-Lyne Tameside OL6 8UY
Proposed demolition of detached garage and construction of single storey side/rear extension
Granted Full applications Extension Demolition 10 docsSmall domestic -
16 St Asaphs Drive Ashton-Under-Lyne Tameside OL6 8UB
Non-material amendment to planning application 20/01019/FUL. Amendments to include change of materials to rear and side elevation of detached garage to cladding from brickwork.
Granted Amendments 3 docs -
5 Southwell Gardens Ashton-Under-Lyne Tameside OL6 8XS
Proposed single storey extension to the rear plus ground and first floor extension at the front plus external alterations
Granted Full applications Extension 6 docsSmall domestic -
113 St Albans Avenue Ashton-Under-Lyne Tameside OL6 8UR
Two storey side extension, two storey/single storey rear extension, single storey detached garage and formation of new access and driveway and other external alterations
Withdrawn Full applications Extension 2 docsSmall domestic
Other full applications applications
In Tameside
-
26/00695/FUL Awaiting decision
74 Thompson Road Denton Tameside M34 2PN
Single storey detached outbuilding
-
26/00693/FUL Awaiting decision
La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP
Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger
-
26/00692/FUL Awaiting decision
9 Cook Street Audenshaw Tameside M34 5DB
Single storey rear and side extension
-
26/00686/FUL Awaiting decision
10 Ostlers Gate Droylsden Tameside M43 7EU
Removal of existing conservatory and construction of new single storey rear extension
-
26/00684/FUL Awaiting decision
6 Warwick Grove Audenshaw Tameside M34 5QT
Proposed double storey side extension