Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Meadow Close Mossley Tameside OL5 9DS

Granted Tameside 23/00237/FUL Full Planning Permission

Works: Extension Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Part single/two storey side extension with dormers to front and rear elevation

As published by the council, reference 23/00237/FUL

Application record

Reference
23/00237/FUL
Type
Full Planning Permission
Status
Decided
Decision
Approve
Received
14 Mar 2023
Validated
15 Mar 2023
Decided
2 May 2023
Ward
Mossley
Parish
Mossley
Decision by
Delegated Decision
Postcode
OL5 9DS

Timeline

Dates from the published record

  1. 14 Mar 2023

    Received by Tameside

  2. 15 Mar 2023

    Validated

    Checked as complete and ready for consideration.

  3. 2 May 2023

    Decision issued: Approve

  4. 6 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

47 applications on PlanIndex · across 6 councils · 94% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Hole House Farm Huddersfield Road Mossley Tameside OL5 9BT

    26/00077/PLCOND Submitted 4 Aug 2026 207m away

    91% historically approved · decision due ~29 Sep

    Full discharge of condition 5 (Drainage) of planning reference 24/00104/FUL

    Awaiting decision 6 docs
  • 19 Tame Valley Close Mossley Tameside OL5 9HD

    23/00071/FUL Submitted 24 Jan 2023 239m away

    Construction of entrance porch to the front elevation to replace existing weather canopy.

    Granted Full applications Extension 4 docs
    Small domestic
  • Land Off Huddersfield Road, Mossley

    26/00004/REM Submitted 5 Jan 2026 261m away

    Reserved matters application for 175 dwellings with associated works pursuant to outline planning permission 18/00159/OUT (layout, scale, appearance and landscaping).

    Granted Reserved matters 65 docs
    Major scheme
  • 419 Manchester Road Mossley Tameside OL5 9BG

    26/00239/FUL Submitted 18 Mar 2026 267m away

    Proposed lower ground floor rear extension with replacement balcony and stairs

    Granted Full applications Extension 6 docs
  • 15 Spring Mill Drive Mossley Tameside OL5 9GG

    21/00437/FUL Submitted 31 Mar 2021 389m away

    Garage conversion with associated external alterations

    Granted Full applications 4 docs
  • 3 Shadow Mews Shadows Lane Mossley Tameside OL5 9BU

    21/00384/CPUD Submitted 20 Mar 2021 466m away

    Lawful Development Certificate for a Proposed Development: Construction of a front porch measuring 2-0m by 1.5m and 3.0m high at apex.

    Granted Outline Extension 3 docs
    Small domestic

In Tameside

  • 26/00695/FUL Awaiting decision

    74 Thompson Road Denton Tameside M34 2PN

    Single storey detached outbuilding

    2 Sep 2026 Full applications
  • 26/00693/FUL Awaiting decision

    La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP

    Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger

    1 Sep 2026 Full applications
  • 26/00692/FUL Awaiting decision

    9 Cook Street Audenshaw Tameside M34 5DB

    Single storey rear and side extension

    28 Aug 2026 Full applications
  • 26/00686/FUL Awaiting decision

    10 Ostlers Gate Droylsden Tameside M43 7EU

    Removal of existing conservatory and construction of new single storey rear extension

    27 Aug 2026 Full applications
  • 26/00684/FUL Awaiting decision

    6 Warwick Grove Audenshaw Tameside M34 5QT

    Proposed double storey side extension

    26 Aug 2026 Full applications