Skip to content
PlanIndex Get alerts
Menu

Planning application

BT Repeator Building Lord Street Denton Tameside

Granted Tameside 23/00220/FUL Full Planning Permission

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing BT building and construction of detached two bedroom bungalow

As published by the council, reference 23/00220/FUL

Application record

Reference
23/00220/FUL
Type
Full Planning Permission
Status
Decided
Decision
Approve
Received
10 Mar 2023
Validated
13 Mar 2023
Decided
28 Apr 2023
Ward
Denton West
Parish
Denton/Audenshaw
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 10 Mar 2023

    Received by Tameside

  2. 13 Mar 2023

    Validated

    Checked as complete and ready for consideration.

  3. 28 Apr 2023

    Decision issued: Approve

  4. 6 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in Hyde

67 applications on PlanIndex · across 9 councils · 89% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 5 Earl Street Denton Tameside M34 2PJ

    26/00508/FUL Submitted 21 Jun 2026 43m away

    91% historically approved · decision due ~27 Aug

    Raising the bungalow roof height to a traditional dwelling, single storey front, and rear extensions

    Awaiting decision Full applications Extension 10 docs
    Small domestic
  • BT Repeator Building Lord Street Denton Tameside M34 2PF

    26/00562/FUL Submitted 8 Jul 2026 60m away

    91% historically approved · decision due ~4 Sep

    Proposed demolition of existing BT building and construction of detached two bedroom bungalow including new front boundary & associated landscaping (revised location plan received 4th August 2026).

    Awaiting decision Full applications Demolition 13 docs
  • 609 Manchester Road Denton Tameside M34 2PF

    26/00515/FUL Submitted 24 Jun 2026 60m away

    91% historically approved · decision due ~21 Aug

    Change of use of existing residential dwellinghouse (Use Class C3) to Childrens residential care home (Use Class C2) accommodating up to five children.

    Awaiting decision Full applications 16 docs
    Domestic
  • 559 Manchester Road Denton Tameside M34 2PF

    21/00469/FUL Submitted 6 Apr 2021 66m away

    Erection of a detached bungalow

    Refused Full applications 13 docs
  • 2 Earl Street Denton Tameside M34 2PJ

    23/00031/FUL Submitted 11 Jan 2023 70m away

    New 2 storey 2 bed dwelling on land to side of 2 Earl Street with associated parking and garden areas following partial demolition of existing garage.

    Granted Full applications Demolition 14 docs
    Domestic
  • 605 Manchester Road Denton Tameside M34 2PF

    25/00041/PLCOND Submitted 30 Apr 2025 94m away

    100% historically approved · decision due ~25 Jun

    Discharge of condition 4 (windows) and condition 10 (soundproofing scheme) of planning permission 24/00376/FUL.

    Awaiting decision Conditions Windows or glazing 7 docs

In Tameside

  • 26/00695/FUL Awaiting decision

    74 Thompson Road Denton Tameside M34 2PN

    Single storey detached outbuilding

    2 Sep 2026 Full applications
  • 26/00693/FUL Awaiting decision

    La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP

    Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger

    1 Sep 2026 Full applications
  • 26/00692/FUL Awaiting decision

    9 Cook Street Audenshaw Tameside M34 5DB

    Single storey rear and side extension

    28 Aug 2026 Full applications
  • 26/00686/FUL Awaiting decision

    10 Ostlers Gate Droylsden Tameside M43 7EU

    Removal of existing conservatory and construction of new single storey rear extension

    27 Aug 2026 Full applications
  • 26/00684/FUL Awaiting decision

    6 Warwick Grove Audenshaw Tameside M34 5QT

    Proposed double storey side extension

    26 Aug 2026 Full applications