Skip to content
PlanIndex Get alerts
Menu

Planning application

11 Sunnyside Grove Ashton-Under-Lyne Tameside OL6 6TN

Granted Tameside 23/00177/FUL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed single storey rear infill extension.

As published by the council, reference 23/00177/FUL

Application record

Reference
23/00177/FUL
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Approve
Received
23 Feb 2023
Validated
23 Feb 2023
Decided
19 Apr 2023
Ward
Ashton-under-Lyne St Michaels
Parish
Ashton-under-lyne
Decision by
Delegated Decision
Postcode
OL6 6TN

Timeline

Dates from the published record

  1. 23 Feb 2023

    Received by Tameside

  2. 19 Apr 2023

    Decision issued: Approve

  3. 24 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Buildingcontrol: 24/00350/DEX (Building Work Started)

Who's behind it

Company information only, from the register and Companies House

Sitec Architectural Agent, an architecture practice

11 applications on PlanIndex · across 5 councils · 90% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

  • DELEGATED REPORT Officer Report · 19 Apr 2023
  • DECISION NOTICE Decision · 19 Apr 2023
  • LOCATION PLAN Drawings · 23 Feb 2023
  • SITE PLAN Drawings · 23 Feb 2023
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 23 Feb 2023
  • EXISTING AND PROPOSED PLANS AND ELEVATIONS Drawings · 23 Feb 2023

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Tameside granted permission on 19 April 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Tameside

  • 26/00804/FUL Awaiting decision

    14 Chestnut Avenue Droylsden Tameside M43 7SA

    REAR FIRST FLOOR EXTENSION AND INTERNAL REMODELLING

    Received 19 Oct, published by the council 20 Oct 2026 Full applications
  • 26/00799/FUL Awaiting decision

    Droylsden Cricket Club Gardenfold Way Droylsden M43 7XU

    Proposed siting of ten modular cabin units and two replacement 40-foot storage containers and associated works

    Received 16 Oct, published by the council 20 Oct 2026 Full applications
  • 26/00800/FUL Awaiting decision

    Premier Inn Alphagate Drive Denton Tameside M34 3SH

    Change of use from restaurant (Use Class E) to Hotel (Use Class C1) and associated works.

    Received 16 Oct, published by the council 19 Oct 2026 Full applications
  • 26/00795/FUL Awaiting decision

    Telecommunications Sub Station Alt Hill Lane Ashton-under-lyne Tameside OL6 8AG

    Creation of a new vehicular access from Alt Hill Lane and erection of a telecommunications cable landing station comprising a cabin (approximately 10.5m x 3.3m and 3.35m in height), generator, meter cabinet, fibre chamber and a 20m x 12m compound enclosed by 1.8m high mesh fencing, together with associated engineering works, concrete bases, earthworks and ancillary infrastructure.

    Received 14 Oct, published by the council 19 Oct 2026 Full applications
  • 26/00794/FUL Awaiting decision

    101 Joel Lane Hyde Tameside SK14 5LF

    Demolition of rear conservatory and rebuild with single storey rear extension, decking and canopies.

    Received 14 Oct, published by the council 22 Oct 2026 Full applications