Skip to content
PlanIndex Get alerts
Menu

Planning application

54 Waddicor Avenue Ashton-Under-Lyne Tameside OL6 9HF

Granted Tameside 23/00124/FUL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey side extension.

As published by the council, reference 23/00124/FUL

Application record

Reference
23/00124/FUL
Type
Full Planning Permission
Status
Decided
Decision
Approve
Received
9 Feb 2023
Validated
9 Feb 2023
Decided
5 Apr 2023
Ward
Ashton-Under-Lyne Hurst
Parish
Ashton-under-Lyne
Decision by
Delegated Decision
Postcode
OL6 9HF

Timeline

Dates from the published record

  1. 9 Feb 2023

    Received by Tameside

  2. 5 Apr 2023

    Decision issued: Approve

  3. 7 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a surveying firm registered in Rochdale

25 applications on PlanIndex · across 3 councils · 92% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 41 St Christophers Road Ashton-Under-Lyne Tameside OL6 9DP

    21/00404/FUL Submitted 24 Mar 2021 199m away

    Demolition/removal of existing ground floor lean-to side/rear extension and replacement with two storey side/rear extension and the creation of a balcony to the rear.

    Granted Full applications Extension Demolition 3 docs
  • 65 The Mere Ashton-Under-Lyne Tameside OL6 9NH

    21/00001/FUL Submitted 1 Jan 2021 252m away

    Removal of existing conservatory and construction of single storey rear extension.

    Granted Full applications Extension 4 docs
    Small domestic
  • Greencroft 3 Greenhurst Lane Ashton-under-lyne Tameside OL6 9DR

    24/00557/FUL Submitted 7 Jun 2024 263m away

    Demolition of existing garage and construction of two-storey side extension.

    Granted Full applications Extension Demolition 7 docs
  • 33 The Mere Ashton-under-lyne Tameside OL6 9NH

    26/00363/HHPD Submitted 23 Apr 2026 283m away

    Single storey rear extension. The length of the extension from the rear of the original house 3.85m. Maximum height of the extension 3.30m. Maximum height of eaves 3.00m

    Granted Prior approval Extension 6 docs
    Small domestic
  • Greencroft 3 Greenhurst Lane Ashton-under-lyne Tameside OL6 9DR

    24/01020/HHPD Submitted 18 Nov 2024 317m away

    Single storey rear extension. The length of the extension from the rear of the original house 10.60m. Maximum height of the extension 6.00m. Maximum height of eaves 4.00m

    Refused Prior approval Extension 3 docs
    Small domestic
  • 91 Lees Road Ashton Tameside OL6 8BQ

    02/00977/FUL Submitted 13 Aug 2002 327m away

    Two storey side extension and rear conservatory

    Granted Full applications Extension 1 doc

In Tameside

  • 26/00695/FUL Awaiting decision

    74 Thompson Road Denton Tameside M34 2PN

    Single storey detached outbuilding

    2 Sep 2026 Full applications
  • 26/00693/FUL Awaiting decision

    La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP

    Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger

    1 Sep 2026 Full applications
  • 26/00692/FUL Awaiting decision

    9 Cook Street Audenshaw Tameside M34 5DB

    Single storey rear and side extension

    28 Aug 2026 Full applications
  • 26/00686/FUL Awaiting decision

    10 Ostlers Gate Droylsden Tameside M43 7EU

    Removal of existing conservatory and construction of new single storey rear extension

    27 Aug 2026 Full applications
  • 26/00684/FUL Awaiting decision

    6 Warwick Grove Audenshaw Tameside M34 5QT

    Proposed double storey side extension

    26 Aug 2026 Full applications